Journals / Scientific Mining Journal / 1994 / Cilt: 33 Sayı: 4

Planning of Fully Mechanised Roadway Drivages Using CPM

TAM MEKANİZE GALERİ AÇMA ÇALIŞMALARININ CPM İLE PLANLANMASI

Pages
23–30
Publication Date
1994-12-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Optimal use of time and resorces during mining mechanisation application which are ipportant elements effecting the overall cost of operation can only be .possible with an effective planning.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Optimal use of time and resorces during mining mechanisation application which are ipportant elements effecting the overall cost of operation can only be .possible with an effective planning.
📊
Key Findings & Data:Optimal use of time and resorces during mining mechanisation application which are ipportant elements effecting the overall cost of operation can only be .possible with an effective planning.
💡
Conclusion & Impact:In this study using the time and labor ob­tained from previous fully mechanized roadway drivage applications in OAL, a fully mechanized roadway drivage work is planned using Critical Path Method (CPM)
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Kritik Yol Metodu · Galeri Açma Makinaları

Abstract

Optimal use of time and resorces during mining mechanisation application which are ipportant elements effecting the overall cost of operation can only be .possible with an effective planning. In this study using the time and labor ob­tained from previous fully mechanized roadway drivage applications in OAL, a fully mechanized roadway drivage work is planned using Critical Path Method (CPM)

Özet

Büyük yatırım tutarları gerektiren madencilikte mekanizasyon uygulamalarında maliyeti etkileyen önemli unsurlar olan zamanın ve kaynakların optimum kullanımı etkin bir planlama ile mümkündür. Bu yazıda OAL'deki tam mekanize galeri açma uygulamalarından elde edilen zaman ve işçilik etudlerinden yararlanılarak bir tam mekanize galeri açma çalışmasının Kritik Yol Metodu(CPM) ile planlanması yapılmıştır

🔖

Cite This Article

Çetin, O., Eyyuboğlu, E. M. (1994). Planning of Fully Mechanised Roadway Drivages Using CPM. Scientific Mining Journal, Cilt: 33 Sayı: 4, 23–30. https://ajindex.com/articles/954183

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...