Risk Assessment for International Construction Projects

Uluslararası İnşaat Projeleri için Risk Değerlendirmesi

Pages
44–51
Publication Date
2023-07-06
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The findings of the study may also help contractors to develop strategies "to bid or no-bid decisions" for high-risk markets.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:International projects are inherently exposed to unforeseeable and complex risk scenarios.
📊
Key Findings & Data:This study aimed to assess and identify the critical risk factors in international contracting projects, based on the analytic hierarchy process (AHP) method.
💡
Conclusion & Impact:The findings of the study may also help contractors to develop strategies "to bid or no-bid decisions" for high-risk markets.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Uluslararası İnşaat · Proje Yönetimi · Risk Değerlendirmesi

Abstract

International projects are inherently exposed to unforeseeable and complex risk scenarios. This study aimed to assess and identify the critical risk factors in international contracting projects, based on the analytic hierarchy process (AHP) method. The most compelling risks that are faced by the construction firms in the Afghanistan market are determined primarily by meta-analysis. According to the data obtained from this analysis, the priorities of the risks and the degree of severity between each other are determined by using the AHP method. This research enhances the current body of knowledge about the possible encountered threats for investing the high-risk construction markets. The findings of the study may also help contractors to develop strategies "to bid or no-bid decisions" for high-risk markets.

Özet

Uluslararası projeler doğası gereği öngörülemeyen ve karmaşık risk senaryolarına maruz kalmaktadır. Bu çalışma, analitik hiyerarşi süreci (AHP) yöntemine dayanarak uluslararası müteahhitlik projelerindeki kritik risk faktörlerini değerlendirmeyi ve tanımlamayı amaçlamıştır. Öncelikle örnek ülke olarak seçilen Afganistan pazarındaki inşaat firmalarının karşı karşıya kaldığı zorlayıcı riskler meta-analiz yöntemi ile belirlenmiştir. Analiz sonucu elde edilen verilere göre AHP yöntemi kullanılarak risklerin öncelikleri ve birbirleri arasındaki önem derecesi tespit edilmiştir. Çalışmanın bulguları, yüksek riskli inşaat pazarlarına yatırım yapma kararı verirken karşılaşılan olası tehditler hakkında mevcut literatüre ve yatırımcılara güncel bilgiler vermektedir. Araştırma sonuçları yüklenicilerin yüksek riskli piyasalar için "teklif verme veya teklif vermeme kararları" stratejileri geliştirmelerine de yardımcı olabilir.

🔖

Cite This Article

UĞURAL, M. N. (2023). Risk Assessment for International Construction Projects. International Journal of Innovative Engineering Applications, Cilt: 7 Sayı: 1, 44–51. https://ajindex.com/articles/949773

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (11)

  1. Bing, L., Tiong, R.L.-K., Fan, W.W. and Chew, D.A.-S. (1999) Risk management in international construction joint ventures Journal of Construction Engineering and Management, 125 (4), pp. 277-284
  2. Zhao, X., Hwang, B.-G., and Low, S.P (2014) Investigating enterprise risk management maturity in construction firms Journal of Construction Engineering and Management, 140 (8). art. No. 05014006
  3. Hwang, B.-G., Zhao, X., and Chin, E.W.Y. (2017) International construction joint ventures between Singapore and developing countries Risk assessment and allocation preferences Engineering, Construction and Architectural Management, 24 (2), pp. 209-228
  4. Gunhan, S., Arditi, D. (2005) “Factors affecting international construction.” J. Constr. Eng. Manage., pp, 273–282
  5. Deng, X., Low, S.P., Zhao, X., and Chang, T. (2018) Identifying micro variables contributing to political risks in international construction projects Engineering, Construction and Architectural Management, 25 (3), pp. 317-334
  6. Ramcharran, H. (1998) “Obstacles and opportunities in international engineering services.” J. Manage. Eng., pp 38–47
  7. Diab, M.F., Varma, A., and Panthi, K. (2017) Modeling the Construction Risk Ratings to Estimate the Contingency in Highway Projects Journal of Construction Engineering and Management, 143 (8), art. No. 04017041
  8. Stephen, M., Picken, D. (2000) Using risk analysis to determine construction project contingencies Journal of Construction Engineering and Management, 126 (2), pp. 130-136
  9. Mills, A. (2001) A systematic approach to risk management for construction Structural Survey, 19 (5), pp. 245-252
  10. Chang, T., Hwang, B.-G., Deng, X., and Zhao, X. (2018) Identifying Political Risk Management Strategies in International Construction Projects (Open Access) Advances in Civil Engineering, 125 pp. 13-16
  11. Crosthwaite, D. (2000) The global construction market: a cross-sectional analysis, Construction Management and Economics, 18, issue 5, pp. 619-627 [12] Duman, D. U., Green, S. D. (2018) Strategizing as Identity Work: Creating Heroes in International Contracting In: Gorse, C and Neilson, C J (Eds) Proceeding of the 34th Annual ARCOM Conference, [13] Tayanç, T. (2011) Geography of Builders: Overseas Contracting Adventure of Turkish Construction Sector, History Foundation, Ankara [14] TCA Turkish International Contracting- 2017 / March. https://www.tmb.org.tr/eng 24.01.2021 [15] Mak, S., Picken, D. (2000) Using risk analysis to determine