Journals / PressAcademia Procedia / 2019 / Cilt: 10 - Sayı: 1

AN OVERWIEV ON PUBLIC-PRIVATE-PARTNERSHIP PROJECTS: A CASE OF TURKEY

Pages
80–84
Publication Date
2019-12-30
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Ensuring that the tendering and contracting processes are correctly configured, hence, all project risks can be identified and the risk sharing can be done more accurately.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Purpose- The aim of this paper is to review the PPP projects that have undertaken in Turkey over a period of 1980-2018.
📊
Key Findings & Data:Methodology- The statistics of PPP projects are examined in terms of the number of projects, values of investments, sectoral distribution.
💡
Conclusion & Impact:Ensuring that the tendering and contracting processes are correctly configured, hence, all project risks can be identified and the risk sharing can be done more accurately.
🔬Design:Review & Systematic Survey
📍Scope:2018 Verileri
⚙️Variables:Public private partnership (PPP) · Turkey · efficiency

Abstract

Purpose- The aim of this paper is to review the PPP projects that have undertaken in Turkey over a period of 1980-2018. Methodology- The statistics of PPP projects are examined in terms of the number of projects, values of investments, sectoral distribution. Findings- Turkey is one of the top users of PPP financing models to construct public projects by comparing the some other countries initiating lots of PPP projects over a long period. Conclusion- In order to achieve success in this complex structure consisting of public, sponsors and financiers in PPP, it is critical to prepare a good project. Predictability of the project obligations will minimize the possibility of additional costs in the future. Ensuring that the tendering and contracting processes are correctly configured, hence, all project risks can be identified and the risk sharing can be done more accurately.

🔖

Cite This Article

TEKER, S., TEKER, D. (2019). AN OVERWIEV ON PUBLIC-PRIVATE-PARTNERSHIP PROJECTS: A CASE OF TURKEY. PressAcademia Procedia, Cilt: 10 - Sayı: 1, 80–84. https://ajindex.com/articles/842183

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (11)

  1. Ahmad, U., Ibrahim, Y., Minai, M.S., (2017). Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors. International Review of Management and Marketing, 7(2), 138-150.
  2. Akimova, Y. A., Kochetkova, S.A., Kovalenko, E.G., Zinina, L.I.,(2016). Public-Private Partnership in Agribusiness. International Review of Management and Marketing, 6(4), 814-822.
  3. Bayazıt, B., Alper, G., (2017). Ultrahazardous Activity Liability In PPP Models: Efficient Allocation of Risk. Ankara Üniversitesi Hukuk Fakültesi Dergisi, 66 (1), 1-47.
  4. Benedict, O., (2013). The Performance of Nigeria Economy and the State of Infrastructural Development and Management. Journal of International Environmental Application & Science, Vol. 8 (2): 304-307.
  5. Boz, S.S., (2013). Kamu Özel İşbirliği (PPP) Modeli. İnönü Üniversitesi Hukuk Fakültesi Dergisi Cilt: 4 Sayı:2 277-332.
  6. Bulbul, D., (2017). Evaluation of the Public Private Partnership Practices in Terms of Financial Transparency in Turkey. The Journal of International Scientific Researches, V.2(7), 94-108.
  7. Canbaz, M., (2019). Küresel Dinamiklerin Kamu Özel İşbirliğine Yaklaşımı: Türkiye İçin Finansal Bir Değerlendirme. İktisadi Yenilik Dergisi, Cilt: 6, Sayı: 2, 46-75.
  8. Çiçek, H., Alicavuşoğlu, Ç., (2016). Türkiye’de Ulaştırma Sektöründe Kamu-Özel Sektör İşbirlikleri: Tokat İli Örneği. Gaziosmanpasa University Social Sciences Researches Journal. V.11(1), 77-93. Cumhurbaşkanlığı Strateji ve Butçe Başkanlğı, (2019). Kamu-Ozel Isbirliği Raporu. Https://www.Sbb.Gov.Tr/Wp-Content/Uploads/2019/05/Kamu-Ozel_Isbirligi_Raporu-2018.Pdf Emek, U., (2017). Sağlık Sektöründe Kamu-Özel İşbirliği Sözleşmeleri: Beklenti Ve Gerçekleşme. Hacettepe HFD, 7(1) 2017, 139–168 European Expertise CentrewHttps://www.Eib.Org/Epec/ Gedik, M.A., (2012). Mali Özgürlük: Avrupa Bölgesi İçin Bir Değerlendirme. Afyon Kocatepe Üniversitesi, İİBF Dergisi ( C.XIV, S.I, 231-250.
  9. Glazyrina, I.,Lavlinskii, S., (2017). Transaction Costs and Prospects for Public-Private Partnership in the Russian Mineral Resourse Sector. International Journal of Economics and Financial Issues, 7(1), 403-413.
  10. İnanc, H., Dönmez, C.Ç., (2018). Evaluation of Value Capture Strategies for Public Private Partnership Projects in Railway System Projects to be Built in Istanbul City. Marmara Fen Bilimleri Dergisi, 3, 286-298
  11. Kahyaoğulları, B., (2013). Public-Private Partnerships in Developing and Developed