Journals / Maliye Dergisi / 2009 / Sayı: 156

Paradigmatic approach relating to the draft of performance-based budgeting in public

Kamuda performans esaslı bütçelemenin tasarımına ilişkin modelsel bir yaklaşım

Pages
249–264
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

A paradigmatic draft was made and each step was explained separately to conduct the implementation process more efficiently.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Today budgets present services aiming at exhibiting the performance of institution and its functions.
📊
Key Findings & Data:Within this context, public institutions began to search for alternative management models measuring its own performance and the performance of its functions.
💡
Conclusion & Impact:A paradigmatic draft was made and each step was explained separately to conduct the implementation process more efficiently.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

Today budgets present services aiming at exhibiting the performance of institution and its functions. Within this context, public institutions began to search for alternative management models measuring its own performance and the performance of its functions. But they confront with serious problems about what kind of a way they should follow in this process. This study’s aim is to put forward the necessary way with a paradigmatic draft public institutions are to follow to be able to prepare a performance-based budget. Because performance-based budget is a part of strategic management, its framework was drawn after the general principles of strategy and strategic management were introduced. A paradigmatic draft was made and each step was explained separately to conduct the implementation process more efficiently.

Özet

Günümüzde bütçeler, kurumun ve fonksiyonlarının performansını ortaya koymaya yönelik hizmetler sunmaktadır. Bu kapsamda kamu kurumları, bütçelerini hazırlarken kendisinin ve fonksiyonlarının performansını ölçecek alternatif yönetim modelleri arayışına girmişlerdir. Ancak bu süreçte nasıl bir yol izleyecekleri hususunda önemli problemlerle karşı karşıya bulunmaktadırlar. Bu çalışmadaki amaç; kamu kurumlarının performans esaslı bütçe hazırlayabilmeleri için izlemeleri gereken yolu, modelsel bir tasarımla ortaya koymaktır. Performans esaslı bütçeleme, stratejik yönetimin bir parçası olduğundan dolayı strateji ve stratejik yönetime ilişkin genel esaslar verildikten sonra performans esaslı bütçelemenin çerçevesi çizilmiştir. Uygulama sürecinin daha etkin oluşturulabilmesi için modelsel bir tasarım yapılmış ve her adım ayrı ayrı anlatılmıştır.

🔖

Cite This Article

ERBAŞI, A. (2009). Paradigmatic approach relating to the draft of performance-based budgeting in public. Maliye Dergisi, Sayı: 156, 249–264. https://ajindex.com/articles/79213

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (20)

  1. Akyüz, Ö. Faruk (2001), Değişim Rüzgarında Stratejik İnsan Kaynakları Planlaması, Sistem Yayıncılık, İstanbul Barry, W. B. (1986), Strategic Planning Workbook for Public and Nonprofit Organizations, Amherst Wilder Foundation, St. Paul Bryson, J. M. (1995), Strategic Planning for Public and Nonprofit Organizations (A Guide to Strengthening and Sustaining Organizational Achievement), Jossey Publishers,
  2. San Francisco Çevik, H. Hüseyin (2001),
  3. Yönetim ve Organizasyon, Ed.: Salih Güney, Nobel Yayıncılık, Ankara David, F. (1997),
  4. Strategic Management, Prentice-Hall Int., New Jersey Dinçer, Ö. (2003), Stratejik Yönetim ve İşletme Politikası, Beta Basım, İstanbul Erbaşı, A. (2008), Belediyelerde Kurumsal Performans Yönetimi, Nobel Yayınları,
  5. Ankara Eren, E. (1997), İşletmelerde Stratejik Yönetim ve İşletme Politikası, Der Yayınları,
  6. İstanbul Eryılmaz, B. (2005),
  7. Kamu Yönetimi, Erkam Matbaası, İstanbul Fındıkçı, İ. (2002), İnsan Kaynakları Yönetimi, 4. Baskı,
  8. Alfa Yayınları,
  9. İstanbul Howe, S. W. (1993),
  10. Corporate Strategy, The Macmillan Pres, Hong Kong Jain, Subhash C. (1993), Marketing Planning & Strategy, 4. Edition,
  11. South - Western Publishing Co., Oclahoma Posner, L. Paul (2003),
  12. Performance Budgeting, Current Developments and Future Prospects, General Accounting Office, U.S.A. Thompson, A., A. J. Strıckland (1996), Strategic Management - Concepts & Cases, Irwin McGraw–Hill Publishing, Princeton Türkçe Sözlük (1998),
  13. Türk Dil Kurumu Yayınları,
  14. Ankara Şentürk, H. (2005), Belediyelerde Performans Yönetimi, 2. Baskı,
  15. İlke Yayıncılık, İstanbul Şimşek, M., M. Nursoy (2002), Toplam Kalite Yönetiminde Performans Ölçme, Hayat Yayınları,
  16. İstanbul Ülgen, H., K. Mirze (2004),
  17. İşletmelerde Stratejik Yönetim, Literatür Yayıncılık,İstanbul Yılmaz, H. (1999) Kamu Mali Yönetiminin Yeniden Yapılandırılması: Dünya Bankası ve Orta Vadeli Harcama Sistemi, DPT Yıllık Programlar ve Konjonktür Değerlendirme Genel Müdürlüğü Finansman Dairesi Yayınları,
  18. Ankara Azaklı, S. (2006), “Belediyelerde Stratejik Planlama Sürecinde Paydaş Analizinin Önemi”, e-akademi Hukuk, Ekonomi ve Siyasal Bilimler Aylık İnternet Dergisi, Haziran, sayı: 52, www.e-akademi.org Durna, U., V. Eren (2002), “Kamu Sektöründe Stratejik Yönetim”, Amme İdaresi Dergisi, Cilt: 35, Sayı: 1, Ankara, s. 55-75
  19. Feurer, R., K. Chaharbaghi (1995), “Strategy Development: Past, Present And Future”, Management Decision, Vol.: 33, No: 6, pp. 11-21
  20. Hinterhuber, H. H., W. Popp (1992), “Are You A Strategist Or Just A Manager?”, Harvard