Journals / Teknik Dergi / 2022 / Cilt: 33 - Sayı: 5

Investigating the Influence of Dam-Breach Parameters on Dam-Break Connected Flood Hydrograph

Pages
12501–12524
Publication Date
2022-09-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

In the light of these targeted findings, the study is aimed to contribute to other relevant research in designating the set of key parameters in experimental or modeling efforts in a way to limit the uncertainty that substantially originates from personal judgment.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The dam-break connected flood hydrograph properties primarily depend on the breach geometry and the time for the breach to fully develop.
📊
Key Findings & Data:To understand the impact of breach parameters on flood peak hydrograph, five of the most common breach prediction methods are implemented in the presented study to estimate the flood hydrographs using 2-dimensional HEC-RAS model.
💡
Conclusion & Impact:In the light of these targeted findings, the study is aimed to contribute to other relevant research in designating the set of key parameters in experimental or modeling efforts in a way to limit the uncertainty that substantially originates from personal judgment.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Dam-break · dam breach flows · sensitivity analysis

Abstract

The dam-break connected flood hydrograph properties primarily depend on the breach geometry and the time for the breach to fully develop. Therefore, the prediction of dam’s breach geometry is essential in dam-break studies. To understand the impact of breach parameters on flood peak hydrograph, five of the most common breach prediction methods are implemented in the presented study to estimate the flood hydrographs using 2-dimensional HEC-RAS model. The Ürkmez Dam is chosen as the case study due to the presence of a residential settlement located right at the dam downstream where undesirably any breach of the dam body can have inevitable and dramatical risks on downstream populations and properties. Various levels for reservoir storage are investigated in each method. In order to assess the impact of each breach parameter on the resulting flood hydrographs, sensitivity analysis is carried out. The peak discharge rates and the times to peak for each analyzed scenario are investigated and discussed. Results reveal that Froehlich approach is the most reasonable method for estimating dam-breach parameters as far as exemplified in the Ürkmez Dam case. Furthermore, sensitivity analysis points out that the parameter of the breach side slope has no major influence on the time to peak while having an insignificant impact on the peak discharge. Besides, the study exhibits that both the peak discharge and the time to peak characteristics are highly sensitive to breach time formation parameter. In the light of these targeted findings, the study is aimed to contribute to other relevant research in designating the set of key parameters in experimental or modeling efforts in a way to limit the uncertainty that substantially originates from personal judgment.

Özet

The dam-break connected flood hydrograph properties primarily depend on the breach geometry and the time for the breach to fully develop. Therefore, the prediction of dam’s breach geometry is essential in dam-break studies. To understand the impact of breach parameters on flood peak hydrograph, five of the most common breach prediction methods are implemented in the presented study to estimate the flood hydrographs using 2-dimensional HEC-RAS model. The Ürkmez Dam is chosen as the case study due to the presence of a residential settlement located right at the dam downstream where undesirably any breach of the dam body can have inevitable and dramatical risks on downstream populations and properties. Various levels for reservoir storage are investigated in each method. In order to assess the impact of each breach parameter on the resulting flood hydrographs, sensitivity analysis is carried out. The peak discharge rates and the times to peak for each analyzed scenario are investigated and discussed. Results reveal that Froehlich approach is the most reasonable method for estimating dam-breach parameters as far as exemplified in the Ürkmez Dam case. Furthermore, sensitivity analysis points out that the parameter of the breach side slope has no major influence on the time to peak while having an insignificant impact on the peak discharge. Besides, the study exhibits that both the peak discharge and the time to peak characteristics are highly sensitive to breach time formation parameter. In the light of these targeted findings, the study is aimed to contribute to other relevant research in designating the set of key parameters in experimental or modeling efforts in a way to limit the uncertainty that substantially originates from personal judgment.

🔖

Cite This Article

NAJAR, M., GÜL, A. (2022). Investigating the Influence of Dam-Breach Parameters on Dam-Break Connected Flood Hydrograph. Teknik Dergi, Cilt: 33 - Sayı: 5, 12501–12524. https://ajindex.com/articles/703172

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (8)

  1. G. Brunner, Using HEC-RAS for Dam Break Studies, TD-39, 2014.
  2. M. Zagonjolli, Dam break modelling, risk assessment and uncertainty analysis for flood mitigation, Delft University of Technology & UNESCO-IHE Institute for Water Education, 2007.
  3. C. A. Pugh and D. W. Harris, Prediction of landslide-generated water waves, 1982.
  4. L. Li, M. Cargnelutti, and C. Mosca, Dam-break events,flood damage, Piemonte region, Italy, Water Resour. Manag., vol. 5, pp. 261–270, 1991.
  5. Z. Bozkuş and A. Kasap, Comparison of physical and numerical dam-break simulations, Turkish J. Eng. Environ. Sci., vol. 22, no. 5, pp. 429–443, 1998.
  6. Z. Bozkuş and A. I. Güner, Pre-event dam failure analyses for emergency management, Turkish J. Eng. Environ. Sci., vol. 25, no. 6, pp. 627–641, 2001.
  7. P. Brufau, M. E. Vázquez-Cendón, and P. García-Navarro, A numerical model for the flooding and drying of irregular domains, Int. J. Numer. Methods Fluids, vol. 39, no. 3, pp. 247–275, May 2002, doi: 10.1002/fld.285. A. M. Yanmaz and M. R. Beşer, On the reliability-based safety analysis of the Porsuk Dam, Turkish J. Eng. Environ. Sci., vol. 29, no. 5, pp. 309–320, 2005, doi: 10.3906/sag-1203-6. J. A. Vásquez and J. G. A. B. Leal, Two-dimensional dam-break simulation over movable beds with an unstructured mesh, Proc. Int. Conf. Fluv. Hydraul. - River Flow 2006, vol. 2, pp. 1483–1491, 2006, doi: 10.1201/9781439833865.ch158. F. Alcrudo and J. Mulet, Description of the Tous Dam break case study (Spain), J. Hydraul. Res., vol. 45, no. sup1, pp. 45–57, Dec. 2007, doi: 10.1080/00221686.2007.9521832. A. Palumbo, S. Frazão, L. Goutiere, D. Pianese, and Y. Zech, Dam-break flow on mobile bed in a channel with a sudden enlargement, in Proceedings international conference on Fluvial Hydraulics, 2008, pp. 645–654.
  8. F. Macchione, Model for Predicting Floods due to Earthen Dam Breaching. I: Formulation and Evaluation, J. Hydraul. Eng., vol. 134, no. 12, pp. 1688–1696, Dec. 2008, doi: 10.1061/(ASCE)0733-9429(2008)134:12(1688). F. Macchione and A. Rino, Model for Predicting Floods due to Earthen Dam Breaching. II: Comparison with Other Methods and Predictive Use, J. Hydraul. Eng., vol. 134, no. 12, pp. 1697–1707, Dec. 2008, doi: 10.1061/(ASCE)0733-9429(2008)134:12(1697). D. C. Froehlich, Embankment Dam Breach Parameters and Their Uncertainties, Environ. Prot., vol. 134, no. May 2011, pp. 1708–1721, Dec. 2008, doi: 10.1061/(ASCE)0733-9429(2008)134:12(1708). S. E. Yochum, L. A. Goertz, and P. H. Jones, Case Study of the Big Bay