Journals / Bilimsel Madencilik Dergisi / 1990 / Cilt: 29 - Sayı: 3

Risk Analizi Risk Analysis in Mining Project Using Microcomputer

Madencilik Projelerinde Mikro-Bilgisayar Destekli Risk Analizi

Pages
19–30
Publication Date
1990-09-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

In this article a brief introduction to risk analysis in mining project and Monte Carlo simulation method together with a small example are given and the results obtained and expected are discussed

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Mining projects have long been recognized as risky investments.
📊
Key Findings & Data:Comput­er simulation is used to determine the effects of changes in various operating conditions or to generate frequency distributions of possible outcomes of variables of interests in the project.
💡
Conclusion & Impact:In this article a brief introduction to risk analysis in mining project and Monte Carlo simulation method together with a small example are given and the results obtained and expected are discussed
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

Mining projects have long been recognized as risky investments. Risk analysis of mining projects is diffucult because of their complexity and because of the high degree of uncertainty that is often associated with the available information. Decision making for this type of projects can be faciliated by application of computer simulation. Comput­er simulation is used to determine the effects of changes in various operating conditions or to generate frequency distributions of possible outcomes of variables of interests in the project. In this article a brief introduction to risk analysis in mining project and Monte Carlo simulation method together with a small example are given and the results obtained and expected are discussed

Özet

Madencilik projeleri, eskiden beri riskli yatırımlar olarak bilinirler. Madencilik projeleri­nin risk analizi, sistemin karmaşıklığından ve eldeki verilerin belirsizliğinden dolayı ol­dukça zordur. Bu projeler için karar vermede bilgisayar benzetim yöntemlerinden yarar­lanılır. Bilgisayar benzetim yöntemi, bir projede işletme koşullarındaki değişikliklerin projeye etkisini saptamada ya da projede ilgilenilen parametrelerin elde edilecek olası sonuçlarının frekans dağılımının elde edilmesinde kullanılır. Bu yazıda, madencilik projelerinde risk analizi ile Monte Karlo Benzetim Yöntemi bir örnekle tanıtılarak elde edilen ve elde edilebilecek sonuçlar tartışılmıştır

🔖

Cite This Article

NASUF, E., ORUN, E. S. (1990). Risk Analizi Risk Analysis in Mining Project Using Microcomputer. Bilimsel Madencilik Dergisi, Cilt: 29 - Sayı: 3, 19–30. https://ajindex.com/articles/58952