Journals / International Journal of Pure and Applied Sciences / 2021 / Cilt: 7 - Sayı: 1

Adaptive Large Neighborhood Search Heuristic for Mixed Blocking Flowshop Scheduling Problem

Pages
152–162
Publication Date
2022-10-19
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The results of the proposed algorithm are very competitive.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Traditional permutation flowshop scheduling problem (PFSP), which has unlimited buffer space, has been interested over the fifty years by several authors to account for many industrial applications.
📊
Key Findings & Data:However, some industries, such as the aerospace industry and other sectors processing industrial waste, have different blocking conditions due to the limited or lack of buffer area between their machines.
💡
Conclusion & Impact:The results of the proposed algorithm are very competitive.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Flowshop Scheduling · Adaptive Large Neighborhood Search · Constraint Programming

Abstract

Traditional permutation flowshop scheduling problem (PFSP), which has unlimited buffer space, has been interested over the fifty years by several authors to account for many industrial applications. However, some industries, such as the aerospace industry and other sectors processing industrial waste, have different blocking conditions due to the limited or lack of buffer area between their machines. In this study, a mixture of different blocking types is considered to solve PFSP with the total flow time criterion regarding several blocking types. A constraint programming model is proposed to solve the PFSP with mixed blocking constraints (MBFSP). Due to the problem's NP-hard nature of the problem, an adaptive large neighborhood search heuristic is proposed to solve the large size instances. The results of the proposed algorithm are very competitive.

🔖

Cite This Article

ÇİL, Z. A., KIZILAY, D. (2022). Adaptive Large Neighborhood Search Heuristic for Mixed Blocking Flowshop Scheduling Problem. International Journal of Pure and Applied Sciences, Cilt: 7 - Sayı: 1, 152–162. https://ajindex.com/articles/541528

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (11)

  1. Blazewicz, J., H. Ecker, K., Pesch, E., Schmidt, G., & Wȩglarz, J. (2007). Handbook on scheduling. From theory to applications. International Handbook on Information Systems. https://doi.org/10.1007/978-3-540-32220-7
  2. Caraffa, V., Ianes, S., P. Bagchi, T., & Sriskandarajah, C. (2001). Minimizing makespan in a blocking flowshop using genetic algorithms. International Journal of Production Economics, 70(2), 101–115. https://doi.org/10.1016/S0925-5273(99)00104-8
  3. Cheng, C.-Y., Lin, S.-W., Pourhejazy, P., Ying, K.-C., & Zheng, J.-W. (2020). Minimizing Total Completion Time in Mixed-Blocking Permutation Flowshops. IEEE Access, 8, 142065–142075. https://doi.org/10.1109/ACCESS.2020.3014106
  4. Grabowski, Jozef, & Pempera, J. (2000). Sequencing of jobs in some production system. European Journal of Operational Research, 125(3), 535–550. https://doi.org/10.1016/S0377-2217(99)00224-6
  5. Grabowski, Józef, & Pempera, J. (2007). The permutation flow shop problem with blocking. A tabu search approach. Omega, 35(3), 302–311. https://doi.org/10.1016/J.OMEGA.2005.07.004
  6. Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979). Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey. Annals of Discrete Mathematics, 5, 287–326. https://doi.org/10.1016/S0167-5060(08)70356-X
  7. Hall, N. G., & Sriskandarajah, C. (1996). A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process. Oper. Res., 44(3), 510–525. https://doi.org/10.1287/opre.44.3.510
  8. Hall, N., & Sriskandarajah, C. (2000). Minimizing Cycle Time in a Blocking Flowshop. Operations Research, 48, 177–180. https://doi.org/10.1287/opre.48.1.177.12451
  9. Johnson, S. M. (1954). Optimal Two and Three Stage Production Schedules With Set-Up Time Included. Naval Research Logistics Quarterly, 1, 61–68. https://doi.org/10.1002/nav.3800010110
  10. Khorramizadeh, M., & Riahi, V. (2015). A Bee Colony Optimization Approach for Mixed Blocking Constraints Flow Shop Scheduling Problems. Mathematical Problems in Engineering, 2015, 612604. https://doi.org/10.1155/2015/612604
  11. Kizilay, D. (2018). Integrating the Optimization of Quay and Yard Operations in Container Terminals. Yasar University. Kizilay, D., Eliiyi, D. T., & Van Hentenryck, P. (2018). Constraint and Mathematical Programming Models for Integrated Port Container Terminal Operations. In W.-J. van Hoeve (Ed.), Integration of Constraint Programming, Artificial Intelligence, and Operations Research (pp. 344–360). Springer International Publishi