⚡ TL;DR(Too Long; Didn't Read)

While the phenol removal values of the systems in the planted and unplanted reactors were obtained as 89.65% ± 2.61 and 83.21%± 5.10 for CW1 respectively, they were 74.55% ± 14.17 and 73.44 % ± 19.07 for CW2 respectively.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The purpose of this study is to examine the removal of phenol from olive mill wastewater in the planted/unplanted constructed wetlands containing filling material at different percentages.
📊
Key Findings & Data:Two constructed wetland systems were developed with two CW1 reactors (containing 100% zeolite) and two CW2 reactors (containing 30% zeolite, 49% gravel and 21% sand) on a laboratory scale.
💡
Conclusion & Impact:While the phenol removal values of the systems in the planted and unplanted reactors were obtained as 89.65% ± 2.61 and 83.21%± 5.10 for CW1 respectively, they were 74.55% ± 14.17 and 73.44 % ± 19.07 for CW2 respectively.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

The purpose of this study is to examine the removal of phenol from olive mill wastewater in the planted/unplanted constructed wetlands containing filling material at different percentages. Two constructed wetland systems were developed with two CW1 reactors (containing 100% zeolite) and two CW2 reactors (containing 30% zeolite, 49% gravel and 21% sand) on a laboratory scale. Cyperus alternatifolius was used as the plant for both systems. The HRT (Hydraulic Retention Time) was determined as 2.8 days in system CW1 while it was 3 days in system CW2. The mean phenol concentration for the 89 days was 22.89 mg/l. While the phenol removal values of the systems in the planted and unplanted reactors were obtained as 89.65% ± 2.61 and 83.21%± 5.10 for CW1 respectively, they were 74.55% ± 14.17 and 73.44 % ± 19.07 for CW2 respectively.

Özet

Bu çalışmanın amacı, hacimce farklı yüzdelerde dolgu meteryaline sahip, bitkili/bitkisiz yapay sulakalanlarda karasudan fenol gideriminin incelenmesidir. Bu amaçla, laboratuvar ölçekli iki adet CW1 reaktörü (%100 zeolitli) ve iki adet de CW2 reaktörü (%30 zeolit-%49 çakıl-%21 kum) yapay sulak alan sistemi olarak geliştirilmiştir. Bitki olarak her bir sistemde Cyperus alternatifolius kullanılmıştır. CW1 sisteminde HRT (Hidrolik Alıkonulma Süresi) 2,8 gün iken, CW2 sisteminde 3 gün olarak belirlenmiştir. 89 günlük işletim süresince, ortalama fenol konsantrasyonu 22,89 mg/L dir. Sistemlerin bitkili ve bitkisiz reaktörlerinde fenol giderimi sırasıyla CW1 için %89,65 ± 2,61, %83,21± 5,10 iken CW2 için sırasıyla %74,55 ± 14,17 ve %73,44 ± 19,07 olarak elde edilmiştir.

🔖

Cite This Article

YALCUK, A. (2022). Farklı yatak malzemeli yapay sulak alanlar ile karasudan fenol giderimi. Ekoloji, Cilt: 20 - Sayı: 80, 1–5. https://ajindex.com/articles/499099

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (10)

  1. Achak M, Mandi L, Ouazzani N (2009) Removal of organic pollutants and nutrients from olive mill waste water by a sand filter. Journal of Environmental Management 90, 2771-2779.
  2. Anonymous (2003) Technical and Regulatory Guidance Document for Constructed Wetlands. The Interstate Technology and Regulatory Council Wetlands Team Online Reports. Online at: www.afcee.brooks.af.mil/products/techtrans/download/WTLND-1.pdf Anonymous (2005) Standard Methods for the Examination of Waste and Wastewater (20th Ed.). APHA, AWWA, Washington. Bubba MD, Checckini L, Pifferi C, Zanieri L, Lepri L (2004) Olive mill wastewater treatment by a pilot scale subsurface horizontal flow constructed wetland. Annali di Chimica 94 (12): 875-887.
  3. Ghiaci M, Abbaspur A, Kia R, Seyedeyn-Azad F (2004) Equilibrium isotherm studies for the sorption of benzene, toluene and phenol onto organo-zeolites and as-synthesized MCM-41. Separation Purification Technology 40: 217-229
  4. Khalid M, Joly G, Renaud A, Magnoux P (2004) Removal of phenol from water by adsorption using zeolites. Industrial and Engineering Chemistry Research 43: 5275-5280.
  5. Kuleyin A (2007) Removal of phenol and 4-chlorophenol by surfactant-modified natural zeolite. Journal of Hazardous Materials 144: 307-315.
  6. Polprasert C, Dan NP, Thayalakumura N (1996) Application of constructed wetlands to treat some toxic wastewater under tropical conditions. Water Science and Technology 34: 165-171.
  7. Stasikanis A, Elia I, Petalas A, Halvadakis J (2008) Removal of total phenols from olive mill wastewater using an agricultural by products, olive pomace. Journal of Hazardous Materials 160: 408-413.
  8. Tee HC, Seng CE, Noor Md A, Lim PE (2009) Performance Comparison of Constructed Wetland with gravel and rice husk-based media for phenol and nitrogen removal. Science of the Total Environment 407: 3563-3571.
  9. Uysal Y, Taner F (2007) The Effect of Cadmium Ions on the Growth Rate of the Freshwater Macrophyte Duckweed Lemna minor. Ekoloji 16 (62): 9-15.
  10. Yesilada O, Sık S, Sam M (1999) Treatment of Olive Oil Mill Wastewater with Fungi. Turkish Journal of Biology 23, 231-240.