Investment evaluation of wind turbine relocation

Pages
6–14
Publication Date
2022-10-11
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The results showedthat it was important for the relocation decision to be made early for the investmentto be more profitable.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Energy has become one of the most important building blocks of many changes inthe world, and it still maintains this quality.
📊
Key Findings & Data:The demand for natural resources andenergy continues to increase daily.
💡
Conclusion & Impact:The results showedthat it was important for the relocation decision to be made early for the investmentto be more profitable.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

Energy has become one of the most important building blocks of many changes inthe world, and it still maintains this quality. The demand for natural resources andenergy continues to increase daily. For this reason, the supply of reliable andsustainable energy has become an important issue that concerns and occupiesmankind. Of the renewable energy sources, wind energy is a clean, reliable andinexhaustible source of energy with low operating costs. Turkey is a rich nation interms of wind energy potential. In this context, the profitability of investmentsmade in utilising domestic and renewable energy potential is important.Investment efficiency is a very important issue before and during the investmentperiod due to the fact that wind energy investments are high cost investments. Inthis study, a solution will be proposed for the replacement of inefficient windturbines which have been installed. In the ideal solution of the issue, the remaininglifetime of the wind turbine which is to be replaced and capacity utilization at thenew location of the turbine will be used as key input factors. The results showedthat it was important for the relocation decision to be made early for the investmentto be more profitable. In the event of delayed decisions to relocate the turbine, ahigh capacity factor is expected in the new location. If a high capacity factor is notachieved, the relocation of the turbine will be meaningless and losses will beincurred for the investor. Also according to the results of the analysis, in the firsttwo years, the turbine operating at a low capacity of 19% and 17% is profitable ifit works at 26% capacity until the end of its economic life when change is made inthe third year.

🔖

Cite This Article

SAKARYA, S., YİLDİRİM, H. H. (2022). Investment evaluation of wind turbine relocation. An International Journal of Optimization and Control: Theories & Applications (IJOCTA), Cilt: 9 - Sayı: 3, 6–14. https://ajindex.com/articles/440599

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (15)

  1. Ministry of Energy and Natural Resources, https://enerji.gov.tr/, Accessed Date (11.10.2018)
  2. Develi, A. & Kaynak, S. (2012). Energy Economics, Frankfurt am Main, ISBN 3631633335, DEU:Peter Lang AG
  3. Turkish Wind Energy Association (2018), Turkish Wind Statistic Report, https://www.tureb.com. tr/yayinlar/turkiye-ruzgar-enerjisi-istatistik-raporutemmuz-2018 [4] Ministry of Energy and Natural Resources (2014). 2015-2019 Strategy Plan, http://sp.enerji.gov.tr/ ETKB_2015_2019_Stratejik_Plani.pdf
  4. Bahgat, G. (2006). Europe’s Energy Security: Challanges and Opportunities, International Affairs, 82(5): 961-975
  5. Desrochers, G., Blanchard, M. & Sud, S. (1986). A Monte-Carlo Simulation Method For The Economic Assessment of The Contribution of Wind Energy to Power Systems, IEEE Transactions on Energy Conversion, (4), 50-56
  6. Venetsanos, K., Angelopoulou, P. & Tsoutsos, T. (2002). Renewable Energy Sources Project Appraisal Under Uncertainty: The Case Of Wind Energy Exploitation Within A Changing Energy Market Environment. Energy Policy, 30(4), 293- 307
  7. Liberman, E. J. (2003). A life cycle assessment and economic analysis of wind turbines using Monte Carlo simulation. MSc Thesis, Air Force Institute Of Technology, Wright-Patterson Air Force Base, Ohio
  8. Özerdem, B., Ozer, S. & Tosun, M. (2006). Feasibility study of wind farms: A case study for Izmir, Turkey, Journal of Wind Engineering and Industrial Aerodynamics, 94(10), 725-743
  9. Vardar, A. & Çetı̇n, B. (2007). Cost Assessment of The Possibility of Using Three Types of Wind Turbine ın Turkey. Energy Exploration &Exploitation, 25(1), 71-82
  10. Moran, D. & Sherrington, C. (2007). An Economic Assessment of Windfarm Power Generation in Scotland Including Externalities, Energy Policy, 35(5), 2811-2825
  11. Madlener, R., & Wenk, C. (2008). Efficient investment portfolios for the Swiss electricity supply sector
  12. Williams, S. K., Acker, T., Goldberg, M. & Greve, M. (2008). Estimating the economic benefits of wind energy projects using Monte Carlo simulation with economic input/output analysis. Wind Energy, 11(4), 397-414
  13. Vardar, A. & Çetin, B. (2009). Economic Assessment of The Possibility of Using Different Types of Wind Turbine in Turkey, Energy Sources, Part B, 4(2), 190-198
  14. Ay, A. (2010). Energy Sources And Investment Project Assessment: A Case Study About Wind Energy In Turkey, Masters Thesis, Bahçeşehir University, Istanbul
  15. Hamamcioğlu, V. (2010). Rüzgar Ener