Journals / Anadolu Üniversitesi Bilim ve Teknoloji Dergisi :A-Uygulamalı Bilimler ve Mühendislik / 2013 / Cilt: 14 - Sayı: 1

THE ANALYSIS OF NEHIL CREEK BASIN AND ITS HYDROELECTRIC ENERGY POTENTIAL

NEHİL ÇAYI HAVZASININ ANALİZİ VE HİDROELEKTRİK ENERJİ POTANSİYELİ

Pages
1–28
Publication Date
2022-10-11
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The total annual electricity to be produced by the dam was found as 39,8GWh.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The required energy of Turkey is being imported from foreign countries since it cannot be metby the country s own resources.
📊
Key Findings & Data:According tothe Simahpp, the total cost and installed power capacity of the dam were found as 41,3x106 US$ and25,2 MW, respectively.
💡
Conclusion & Impact:The total annual electricity to be produced by the dam was found as 39,8GWh.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

The required energy of Turkey is being imported from foreign countries since it cannot be metby the country s own resources. However, Turkey has rich renewable water resources. In this paper,the hydropower potential of Nehil Creek, which is a subbasin of Zap basin, is investigated consideringthe effective use of this source and covering the existing energy gap, partially. Here, Geographic In- formation Systems (GIS) and Remote Sensing (RS) methods were used. According to preliminaryresearch, one dam has been planned to be installed on the Nehil Creek basin. The possible costs of thisdam and the amount of annual electric energy that can be obtained were calculated. The total costs andthe total installed power capacity of the dam were solved by using the Simahpp software. According tothe Simahpp, the total cost and installed power capacity of the dam were found as 41,3x106 US$ and25,2 MW, respectively. The total annual electricity to be produced by the dam was found as 39,8GWh.

Özet

Türkiyede enerji ihtiyacı, ülkenin öz kaynaklarından karşılanamadığı için yurt dışından ithaledilmektedir. Oysa Türkiyenin zengin yenilenebilir su kaynakları vardır. Bu makalede, Nehil Çayının(Zap suyu alt havzası) sahip olduğu hidroelektrik enerji potansiyeli, bu kaynağın efektif kullanımınave böylece ülkenin enerji açığını kısmen kapatmaya yönelik olarak araştırılmıştır. Araştırma, CoğrafiBilgi Sistemleri (GIS) ve Uzaktan Algılama metotları kullanılarak yapılmıştır. Ön araştırmaya göre,Nehil Çayı havzasında bir adet barajın planlaması yapılmış ve bu barajın olası maliyetleri ve buradantemin edilebilecek yıllık elektrik enerjisi miktarı hesaplanmıştır. Barajın toplam maliyetleri ve kurulugücü Simahpp yazılımı ile hesaplanmıştır. Simahpp yazılımına göre, Nehil Çayı havzasında planlananbarajın toplam maliyeti ve kurulu gücü, 41,3x106 US$ ve 25,2 MW olarak elde edilmiştir. Yıldaüretebileceği elektrik enerjisi miktarı ise 39,8 GWh olarak belirlenmiştir.

🔖

Cite This Article

GÖNCÜ, S., GÜMÜŞLÜOĞLU, E., BAKIŞ, R. (2022). THE ANALYSIS OF NEHIL CREEK BASIN AND ITS HYDROELECTRIC ENERGY POTENTIAL. Anadolu Üniversitesi Bilim ve Teknoloji Dergisi :A-Uygulamalı Bilimler ve Mühendislik, Cilt: 14 - Sayı: 1, 1–28. https://ajindex.com/articles/438384

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (5)

  1. Altınbilek, D. (2000). “Hydroelectric Develop- ment Plans in Turkey”, DSI, The General, Directorate of State Hydraulic Works of Turkey, (http://www.dsi.gov.tr). Anonim. (1992a). “Grid Commands References, Arc/Info User’s Guide”, Environmental Systems Research Institute (ESRI), Inc., USA. Anonim. (1992b). “Cell-based Modeling with Grid, Arc/Info User’s Guide”, Environ- mental Systems Research Institute (ESRI), Inc., USA. Anonim. (1987). “Zap Suyu Havzası Master Plan Raporu”, Elektrik İşleri Etüt İdaresi, Gizbili Mühendislik Firması, Ankara.
  2. Aronoff, S. (1991). “Geographic Information Systems: A Management Perspective”, WDL Publ., Canada. Asquith, W.H., Roussel M.C., Vrabel, J. (2006). “State wide analysis of the drainage-area ratio method for 34 streamflow percentile ranges in Texas”, U.S. Geological Survey Scientific Investigations Report 2006– 5286, 34, 1 appendix. Bakış, R., Göncü, S., Gümüşlüoğlu, E. (2012). Zap Suyu Havzası Hidroelektrik Enerji Potansiyelinin Araştırılması, Bilimsel Araştırma Projesi (Proje No: AÜBAP 090234, Proje Yürütücüsü: R Bakis), Eskişehir. Bakış, R., Altan, M., Gümüşluoğlu, E., Tuncan, A., Ayday, C., Önsoy, H., Olgun, K. (2008). “Porsuk Havzası Su Potansiyeli- nin Hidroelektrik Enerji Üretimi Yönün- den İncelenmesi”, Eskisehir Osmangazi Üniversitesi Mühendislik Mimarlık Fakül- tesi Dergisi C.XXI, S.2., 125-162.
  3. Bakış, R. (2005). “Electricity Generation from Existing Multipurpose Dams in Turkey”, Energy Exploration  Exploitation, Vo- lume 23, Number 6, 495-516.
  4. Bayazıt, M., Avcı, I. (1997).“Water Resources of Turkey: Potential, Planning Develop- ment and Management, Water Resources Development, Vol. 13, No. 4, 443-452.
  5. Denholm, P.,Ela, E., Kirby, B., Milligan, M. (2010). The Role of Energy Storage with Renewable Electricity Generation, Tech- nical Report (Prepared under Task No. WER8.5005) of National Renewable Energy Laboratory (NREL), NREL/TP- 6A2-47187, U.S. Department of Energy Office of Energy Efficiency and Re- newable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308, 51. DMİ. (2009). Devlet Meteoroloji İşleri Genel Müdürlüğü (wwwdmi.gov.tr). DSİ. (2010, 2009, 2008). Devlet Su işleri Genel Müdürlüğü (dsi.gov.tr). EİE. (2009, 2007). Elektrik İşleri Etüt İdaresi Genel Müdürlüğü (EİE, 2007, eie.gov.tr) EİE. (1996). “Hakkari Barajı ve Hidroelektrik Santrali Yapılabilirlik Raporu”, EİE Elektrik İşleri Etüt İdaresi Genel Müdür- lüğü, Proje Dairesi Başkanlığı, 250. EİE (1987a). “Elektrik