Journals / Anadolu Üniversitesi Bilim ve Teknoloji Dergisi :A-Uygulamalı Bilimler ve Mühendislik / 2015 / Cilt: 16 - Sayı: 1

COMPLETION OF MISSING DATA IN RIVERS FLOW MEASUREMENT: CASE STUDY OF ZAB RIVER BASIN

Pages
63–79
Publication Date
2022-10-11
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Therefore, different methods should be used as much as possible, not just only one method,for filling missing values and comparison of the results from different methods would lead to bestmissing data filling method.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:For the planning of water resources based on the demands through the basin, water potential of thebasin must be analyzed carefully.
📊
Key Findings & Data:For these analyses to be accurate and dependable, completemeteorological and flow data must be obtained which covers a long period of previous years.
💡
Conclusion & Impact:Therefore, different methods should be used as much as possible, not just only one method,for filling missing values and comparison of the results from different methods would lead to bestmissing data filling method.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

For the planning of water resources based on the demands through the basin, water potential of thebasin must be analyzed carefully. For these analyses to be accurate and dependable, completemeteorological and flow data must be obtained which covers a long period of previous years. Because,especially missing flow monitoring data used at the planning stage of water structures have beenreported to induce serious hazards at the operating stage. In this paper, filling of the missing data obtained from the flow gauging stations (FGS) wasperformed using regression analyses related to the correlations and drainage area-ratio methods. ZabRiver basin has been used for studying area.In order to fill the missing data, linear and non-linear regression equations have been used foridentifying the missing values without disturbing the statistical structure of the original (long) data sets.The same approach was followed for drainage area-ratio method. The size of missing part of the data,however, is one of the most important points to consider in filling the missing values. Especially in caseof large amount of missing values, both filling methods resulted in large deviation when compared withoriginal data. Therefore, different methods should be used as much as possible, not just only one method,for filling missing values and comparison of the results from different methods would lead to bestmissing data filling method.

🔖

Cite This Article

GÖNCÜ, S., BAKIŞ, R. (2022). COMPLETION OF MISSING DATA IN RIVERS FLOW MEASUREMENT: CASE STUDY OF ZAB RIVER BASIN. Anadolu Üniversitesi Bilim ve Teknoloji Dergisi :A-Uygulamalı Bilimler ve Mühendislik, Cilt: 16 - Sayı: 1, 63–79. https://ajindex.com/articles/438373

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (9)

  1. Anonim (1987).
  2. Zap Suyu Havzası Master Plan Raporu, Elektrik İşleri Etüt İdaresi, GİZBİLİ Mühendislik Firması, Ankara.
  3. Anonim (2009). SPSS Missing Values™ 17 Users Guide, SPSS Inc., Chicago, IL, USA., 15. Asquith, W.H., Roussel, M.C., and Vrabel, Joseph (2006). Statewide Analysis of The Drainage-Area Ratio Method for 34 Streamflow Percentile Ranges in Texas: U.S. Geological Survey Scienti fic Investigations Report 2006–5286, 34, 1 Appendix. Bal, C. ve Özdamar, K., (2004). Eksik Gözlem Sorununun Türetilmiş Veri Setleri Yardımıyla Çözümlenmesi, Osmangazi Üniversitesi Tıp Fakültesi Dergisi 26(2):67-76.
  4. Burgess, T. M. and Webster, R., (1980). Optimal Interpolation and Isarithmic Mapping of Soil Properties I, The Semivariogram and Punctual Kriging. Journal of Soil Science, 31(3):315-331.
  5. Dastorani M.T, Moghadamnia A., Piri J. and Rico-Ramirez M., (2010). Application of ANN ANFIS Models for Reconstructing Missing Flow Data, DOI 10.1007/s10661-009-1012-8, Environ. Monit. Assess. 166(1-4):421-434. Dursun Ö.F. ve Karabatak M., (2009). Fırat Havza’sındaki Eksik Akım Verileirnin Korelasyon ve Yapay Sinir Ağları Metotları ile Tahmin Edilmesi, e-Journal of New World Sciences Academy, 4(1): 1A0004, 30-40.
  6. Elshorbagy, A.A. Panu, U.S.,Simonovic, S.P., (2000). Group-based Estimation of Missing Hydrological Data: I. Approach and General Methodology, Hydrological Sciences-Journal-des Sciences Hydrologiques, 45(6):849-866.
  7. Emerson, D.G., and Dressler, V.M., (2002). Historic and unregulated monthly streamflow for selected sites in the Red River of the North Basin in North Dakota, Minnesota, and South Dakota, 1931-99: U.S. Geological Survey Water- Resources Investigations Report 02- 4095, 271. Emerson, D.G., Vecchia, A.V. ve Dahl, A.L., (2005). Evaluation of Drainage-Area Ratio Method used to Estimate Streamflow for the Red River of the North Basin, North Dakota and Minnesota, USGS Scienti fic Investigations Report 2005-5017,
  8. U.S. Geological Survey, Reston, Virginia. Guenthner, R.S., Weigel, J.F., and Emerson, D.G., (1990). Gaged and Estimated Monthly Streamflow During 1931-84 for Selected Sites in The Red River of the North Basin in North Dakota and Minnesota: U.S. Geological Survey Water-Resources Investigations Report 90-4167, 230. Gümüş V. ve Kavşut E., (2013). Zamanti Nehri- Ergenuşağı İstasyonu Eksik Aylık Akım Verilerinin Tahmini, Gazi Üniversitesi Fen Bilimleri Dergisi Part:C, Tasarım ve Teknoloji, 1(2):81-91.
  9. Gündoğdu K. S., Demir A. O. ve Akkaya Aslan, Ş. T., (2001).