Journals / Alphanumeric Journal / 2020 / Cilt: 8 - Sayı: 2

Multi-product Production-Inventory Model and Analysis within the Context of Environmental Sensitivity

Pages
275–297
Publication Date
2022-10-11
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Two numerical examples with sensitivity analysis are provided to illustrate the results.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In recent years, accounting of carbon (CO2) emissions in the modeling of supply chains has become as important as achieving an effective coordination between supplier(s) and buyer(s).
📊
Key Findings & Data:Because, carbon emissions are a measure of the sensitivity to the environment.
💡
Conclusion & Impact:Two numerical examples with sensitivity analysis are provided to illustrate the results.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

In recent years, accounting of carbon (CO2) emissions in the modeling of supply chains has become as important as achieving an effective coordination between supplier(s) and buyer(s). Because, carbon emissions are a measure of the sensitivity to the environment. In this study, a multi-product inventory problem containing defective products is considered under the assumptions of environmental sensitivity and limited storage space, and mathematical models are developed. The total cost of the problem comprise of cost of setup, cost of production, cost of screening, cost of disposal, cost of holding, cost of carbon emission and carbon emissiontax. The optimal production cycle time and production quantities that minimize the expected total cost are obtained with the help of a developed algorithm. All calculations in the developed algorithm are performed using Microsoft Excel program. Two numerical examples with sensitivity analysis are provided to illustrate the results.

🔖

Cite This Article

ÖZTÜRK, H. (2022). Multi-product Production-Inventory Model and Analysis within the Context of Environmental Sensitivity. Alphanumeric Journal, Cilt: 8 - Sayı: 2, 275–297. https://ajindex.com/articles/435100

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (13)

  1. Ağralı, S. (2012). A Dynamic Uncapacitated Lot-Sizing Problem with Co-Production. Optimization Letters, 6(6), 1051-1061.
  2. Aslani, A., Taleizadeh, A.A. ve Zanoni, S. (2017). An EOQ model with Partial Backordering with regard to Random Yield: Two Strategies to Improve Mean and Variance of the Yield. Computers & Industrial Engineering, 112, 379-390.
  3. Ay, C. ve Ecevit, Z. (2005). Çevre Bilinçli Tüketiciler. Akdeniz Üniversitesi, İ.İ.B.F. Dergisi, 5(10), 238- 264. Battini, D., Persona, A. ve Sgarbossa, F. (2014). A Sustainable EOQ Model: Theoretical Formulation and Applications. International Journal of Production Economics, 149, 145-153.
  4. Ben-Daya, M. ve Hariga, M. (2000). Economic Lot Scheduling Problem with Imperfect Production Processes. The Journal of the Operational Research Society, 51(7), 875-881.
  5. Bonney, M. ve Jaber, M.Y. (2011). Environmentally responsible inventory models: Non-classical models for a non-classical era. International Journal of Production Economics, 133(1), 43-53.
  6. Büyüközkan, G. ve Vardaloğlu, Z. (2008). Yeşil Tedarik Zinciri Yönetimi. Lojistik Dergisi, 8, 66-73.
  7. Chan, H.K., Chung, S.h. ve Lim, M.K. (2013). Recent Research Trend of Economic-Lot Scheduling Problems. Journal of Manufacturing Technology Management, 24(3), 465-482.
  8. Chiu, Y.P. (2003). Determining The Optimal Lot Size for The Finite Production Model with Random Defective Rate, The Rework Process, and Backlogging. Engineering Optimization, 35(4), 427- 437. Crowley, T.J. (2000). Causes of Climate Change over the past 1000 Years. Science, 289(5477), 270- 277. Hayek, P. A., & Salameh, M. K. (2001). Production Lot Sizing with The Reworking of Imperfect Quality Items Produced. Production Planning & Control, 12(6), 584-590.
  9. Hsu, W.K.K. ve Yu, H.F. (2009). EOQ Model for Imperfective Items under a One-Time-Only Discount. Omega, 37(5), 1018-1026.
  10. Huang, Y.S., Fang, C.C. ve Lin, Y.A. (2020). Inventory Management in Supply Chains with Consideration of Logistics, Green Investment and Different Carbon Emissions Policies. Computers & Industrial Engineering, 139, 1-16.
  11. Jaber, M.Y., Glock, C.H. ve El Saadany, A.M.A. (2013). Supply Chain Coordination with Emissions Reduction Incentives. International Journal of Production Research, 51(1), 69-82.
  12. Jaber, M.Y., Goyal, S.K. ve Imran, M. (2008). Economic Production Quantity Model for Items with Imperfect Quality Subject to Learning Effects. International Journal of Production Economics, 115, 143–150.
  13. Jaggi, C.K., Goel, S.K. ve Mittal, M. (2013). Cred