DETERMINATION OF THE RELATIONSHIP BETWEEN ESTIMATED COSTS AND ACTUAL COSTS OF PUBLIC BUILDING CONSTRUCTION PROJECTS

KAMUYA AİT BİNA İNŞAATLARINDA TAHMİN EDİLEN MALİYET İLE GERÇEKLEŞEN MALİYET ARASINDAKİ İLİŞKİNİN BELİRLENMESİ

Pages
677–692
Publication Date
2003-12-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Within the direction of this aim, amount of work, total cost and changes in unit prices have been determined

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, the relationship between the estimated costs and actual costs of public building construction projects has been investigated by using the related data which belongs to various public building construction projects undertaken between the years 1990 and 2002.
📊
Key Findings & Data:In this study, the relationship between the estimated costs and actual costs of public building construction projects has been investigated by using the related data which belongs to various public building construction projects undertaken between the years 1990 and 2002.
💡
Conclusion & Impact:Within the direction of this aim, amount of work, total cost and changes in unit prices have been determined
🔬Design:Research Article
📍Scope:2002 Verileri
⚙️Variables:Keşif bedeli · Yapı Maliyeti · Kesin hesap

Abstract

In this study, the relationship between the estimated costs and actual costs of public building construction projects has been investigated by using the related data which belongs to various public building construction projects undertaken between the years 1990 and 2002. Within the direction of this aim, amount of work, total cost and changes in unit prices have been determined

Özet

Bu çalışmada, 1990-2002 yılları arasında yapımı gerçekleştirilmiş olan kamuya ait bina inşaatlarının keşif bedelleri ve maliyet bilgileri ele alınarak, başlangıçta öngörülen yaklaşık maliyet bedeli ile iş sonunda gerçekleşen maliyet bedeli arasındaki ilişki araştırılmıştır. Bu amaçla, ülke genelinde yapımı tamamlanan afet konutları ve kaymakam evleri örnek olarak seçilerek iş hacmi, toplam maliyet ve birim maliyet değişimleri tespit edilmiştir.

🔖