Journals / Sigma Mühendislik ve Fen Bilimleri Dergisi / 2020 / Cilt: 38 - Sayı: 3

ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP

Pages
1447–1462
Publication Date
2021-10-05
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The findings show that the contract-related characteristics, contract type, project value, and construction-related characteristics are the most critical characteristics of construction projects related to risk occurrence cases.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The performance of the construction industry has been widely criticized in the literature due to substantial delays and cost overruns.
📊
Key Findings & Data:The dynamic, turbulent, and complex environment of the construction industry can lead to poor performance causing occurrence of numerous risks that can adversely affect the performance of the projects.
💡
Conclusion & Impact:The findings show that the contract-related characteristics, contract type, project value, and construction-related characteristics are the most critical characteristics of construction projects related to risk occurrence cases.
🔬Design:Survey & Empirical Study
📍Scope:Comprehensive Sample
⚙️Variables:Risk management · risk identification · project characteristics

Abstract

The performance of the construction industry has been widely criticized in the literature due to substantial delays and cost overruns. The dynamic, turbulent, and complex environment of the construction industry can lead to poor performance causing occurrence of numerous risks that can adversely affect the performance of the projects. Risk management plays an important role in the improvement of performance of construction projects. However, performance of risk management is challenging due to limited availability of information, particularly during the risk identification stage. This study aims to identify the characteristics of the construction projects that are critical in the occurrence of the risks. For that purpose, an in-depth literature review was conducted to extract characteristics of the construction projects in the first step of the study. Then, a questionnaire survey was prepared to collect expert opinions. Finally, a MATLAB script was developed in-house to perform a fuzzy AHP method to analyze the gathered data. The findings show that the contract-related characteristics, contract type, project value, and construction-related characteristics are the most critical characteristics of construction projects related to risk occurrence cases.

🔖

Cite This Article

OKUDAN, O., BUDAYAN, C. (2021). ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP. Sigma Mühendislik ve Fen Bilimleri Dergisi, Cilt: 38 - Sayı: 3, 1447–1462. https://ajindex.com/articles/419082

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (13)

  1. Sexton, M., P. Barret, (2003), “A literature synthesis of innovation in small construction firms: insights, ambiguities and questions,” Construction Management and Economics, 21 (6), 613–622
  2. Barrett, P., M. Sexton, (2006), “Innovation in small, project-based construction firms,” British Journal of Management, 17 (4), 331–346
  3. Rezgui, Y., A. Zarli, (2006), “Paving the way to the vision of digital construction: A strategic roadmap,” Journal of Construction Engineering and Management, 132 (7), 767–776
  4. Beatham, S., C. Anumba, T. Thorpe, I. Hedges, (2004), “KPIs: A critical appraisal of their use in construction,” Benchmarking: An International Journal, 11 (1), 93–117
  5. Alinaitwe, H., J. A. Mwakali, B. Hansson, (2009), “Organizational effectiveness of Ugandan building firms as viewed by craftsmen,” Journal of Civil Engineering and Management, 15 (3), 281–288
  6. Rivas, R. A., J. D. Borcherding, V. González, L. F. Alarcón, (2011), “Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company,” Journal of Construction Engineering and Management, 137 (4), 312–320
  7. Fidan, G., I. Dikmen, A. M. Tanyer, M. T. Birgonul, (2011), “Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects,” Journal of Computing in Civil Engineering, 25 (4), 302–315
  8. Zhi, H., (1995), “Risk management for overseas construction projects,” International Journal of Project Management, 13 (4), 231–237
  9. Wang, S. Q., M. F. Dulaimi, M. Y. Aguria, (2004), “Risk management framework for construction projects in developing countries,” Construction Management and Economics, 22 (3), 237–252
  10. Han, S. H., D. Y. Kim, H. Kim, W. S. Jang, (2008), “A web-based integrated system for international project risk management,” Automation in Construction, 17 (3), 342–356
  11. Dikmen, I., C. Budayan,; M Talat Birgonul, E. Hayat, C. Eng, (2018), “Effects of Risk Attitude and Controllability Assumption on Risk Ratings: Observational Study on International Construction Project Risk Assessment.
  12. Kamara, J. M., C. J. Anumba, P. M. Carrillo, N. Bouchlaghem, “Conceptual framework for live capture and reuse of project knowledge,” in CIB W78 International Conference on Information Technology for Construction, 2003, 178–185
  13. Dikmen, I., M. T. Birgonul, C. Anac, J. H. M. Tah, G. Aouad, (2008), “Learning from risks: A tool for post-project risk assessment,” Automation in Construction, 18 (