Journals / Journal of International Environmental Application and Science / 2016 / Cilt: 11 - Sayı: 4

The Possibility of Increasing the Air Flow in the Stope S-144 "Trepca" Stanterg

Pages
371–375
Publication Date
2016-12-30
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The current state of the shaft (raise) ventilation for the moment is considered as a sensitive and has great curves during the working phase encountering in soft rocks (schist) thus it made impossible the opening of vertical shaft where we concluded that there do not appear the major resistance and loss of the amount of air.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The stope S-144 as a system of exploitation it is applied and is applying the method of exploitation with filling from bottom upwards where for access to the stope respectively in benches has applied so called classical method with vertical objects (passage for people).
📊
Key Findings & Data:In bench 5 has been changed the working principle being applied the approach in the stope by ramp method where it is changed the principle of drilling and loading (application of high productivity machines – Boomer and diesel mechanic loaders Toro and Wagner).
💡
Conclusion & Impact:The current state of the shaft (raise) ventilation for the moment is considered as a sensitive and has great curves during the working phase encountering in soft rocks (schist) thus it made impossible the opening of vertical shaft where we concluded that there do not appear the major resistance and loss of the amount of air.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:security crown · ore body · pillar

Abstract

The stope S-144 as a system of exploitation it is applied and is applying the method of exploitation with filling from bottom upwards where for access to the stope respectively in benches has applied so called classical method with vertical objects (passage for people). In bench 5 has been changed the working principle being applied the approach in the stope by ramp method where it is changed the principle of drilling and loading (application of high productivity machines – Boomer and diesel mechanic loaders Toro and Wagner). The above mentioned stope for now possesses these mining facilities: 1) horizontal adit that connects the ramp; 2) shaft for filling of mining area where at the same time it is like air shaft, and; 3) passages for people where the one of them has already been out of operation while the other one serves as the pit for ore haulage of this stope. The current state of the shaft (raise) ventilation for the moment is considered as a sensitive and has great curves during the working phase encountering in soft rocks (schist) thus it made impossible the opening of vertical shaft where we concluded that there do not appear the major resistance and loss of the amount of air.

🔖

Cite This Article

GASHİ, J., JORGJİ, V., ZEQİRİ, İ., KELEMENDİ, R., KUTLLOVCİ, F. (2016). The Possibility of Increasing the Air Flow in the Stope S-144 "Trepca" Stanterg. Journal of International Environmental Application and Science, Cilt: 11 - Sayı: 4, 371–375. https://ajindex.com/articles/376709

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (2)

  1. Abrashi R, (1983)
  2. Mining Air Universitety of Prishtina, Mitrovica, Kosovo Zeqiri I, Gashi J., Kelmendi Sh., Zeqiri R. (2012) Conceptual design of ventilation for new horizons (XII-XIII) in the mine of Trepca in Stanterg, University of Pristina, Kosovo SGEM 2012, Bulgaria Lategan PN, (2009) Shaft sinking scheduling / planning. Shaft Sinking and Mining Contractors Walters DM, (2009) Ventilation for sinking vertical, sub vertical and decline shafts. Shaft Sinking and Mining Contractors Conference. The Southern African Institute of Mining and Metallurgy.