Data used for these calculations were collected for work measurement of cotton weaving preparation machines of Denizli factories.
📌 3 Key Takeaways
🎯
Objective & Hypothesis:In this study, some examplex of production norm and useful time coefficient calculations were presented for winding, warping, and sizing machines.
📊
Key Findings & Data:In this study, some examplex of production norm and useful time coefficient calculations were presented for winding, warping, and sizing machines.
💡
Conclusion & Impact:Data used for these calculations were collected for work measurement of cotton weaving preparation machines of Denizli factories.
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters
Abstract
In this study, some examplex of production norm and useful time coefficient calculations were presented for winding, warping, and sizing machines. Data used for these calculations were collected for work measurement of cotton weaving preparation machines of Denizli factories.
Özet
Bu çalışmada bobinleme, seri çözgü ve haşıl makinelerinin yararlı zaman ve katsayılarının ve üretim normlarının hesaplanması örnekleri sunulmuştur. Bu hesaplamalarda kullanılan değerler, pamuklu dokuma hazırlık makinelerinde zaman etüdü konusunda Denizli fabrikalarında yapılmış araştırmalardan toplanmıştır.
🔖
Cite This Article
FETTAHOF, R., İKİZ, Y. (2002). Determination of effciency and production norm of cotton weaving preparation machines. Tekstil Maraton, Cilt: 12 - Sayı: 58, 50–55. https://ajindex.com/articles/359848