Journals / Mathematical and Computational Applications / 2011 / Cilt: 16 - Sayı: 1

A facility layout problem in a marble factory via simulation

Pages
97–104
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Such cases may cause a significant increase in transportation of materials between machines that decreases the utilization rates of machines and operators as well as overall productivity.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The marble factory in this study is a typical instance of a flow shop based production system.
📊
Key Findings & Data:Such cases may cause a significant increase in transportation of materials between machines that decreases the utilization rates of machines and operators as well as overall productivity.
💡
Conclusion & Impact:The proposed layout provides reduction in total transportation time as well as an increase in productivity.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Abstract

The marble factory in this study is a typical instance of a flow shop based production system. Adding new machines to the plant and/or introducing a new product may convert the actual layout to an inefficient one. Such cases may cause a significant increase in transportation of materials between machines that decreases the utilization rates of machines and operators as well as overall productivity. Therefore, facility planning is a key issue in marble plants in terms of total cost and customer satisfaction. Another important property of these plants is its dynamic and stochastic behavior in terms of scrap rates, demands and processing times. The aim of this study is to develop an efficient plant layout for such dynamic systems. At first, the simulation model of the current system is built on ARENA 10.0. Then, an alternative layout is generated after some analysis and then, it is evaluated via simulation model. The proposed layout provides reduction in total transportation time as well as an increase in productivity.

Özet

Türkçe Öz Yok

🔖

Cite This Article

EDİS, R. S., KAHRAMAN, B., Araz, O. U., ÖZRIFAT, M. K. (2011). A facility layout problem in a marble factory via simulation. Mathematical and Computational Applications, Cilt: 16 - Sayı: 1, 97–104. https://ajindex.com/articles/279922

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (1)

  1. T.Onargan, H. Köse, and A.H. Deliormanli, Marble (third press), Turkish Mining Engineering Chamber Publications, Ankara, 2005. 2.A.I. Sönmez, Production plant design with applications, University of Gaziantep Publications, 1998. 3.A. Kusiak, and S.S. Heragu, The facility layout problem, European Journal of Operational Research 29(3), 229-251, 1987. 4.B.K. Kaku, G.L. Thompson, and T.E. Morton, A hybrid heuristic for the facilities layout problem, Computers & Operations Research 18(3), 241-253, 1991. 5.K.R. Kumar, G.C. Hadjinicola, and T. Lin, A heuristic procedure for the single-row facility layout problem, European Journal of Operational Research 87(1), 65-73, 1995. 6.K. Tsuchiya, S. Bharitkar, and Y. Takefuji, A neural network approach to facility layout problems, European Journal of Operational Research 89(3), 556-563, 1996. 7.S.P. Singh, Solving facility layout problem: three-level tabu search metaheuristic approach, International Journal of Recent Trends in Engineering 1(1), 73, 2009. 8.R. Sharpe, and B.S. Marksjö, Solution of the facilities layout problem by simulated annealing, Computers, Environment and Urban Systems 11(4), 147-154, 1986. 9.R.R. Levary, and S. Kalchik, Facilities layout-A survey of solution procedures, Computers & Industrial Engineering 9(2), 141-/148, 1985. 10.S. Benjafaar, S.S. Heragu, and S.A. Irani, Next generation factory layouts: research challenges and recent progress, Interfaces 32(6), 58-76, 2002. 11.ARENA, User's Guide, Publication ARENA-UB001B-EN-P, October 2005.