EMEK YOĞUN ÇALIŞILAN PROJE TİPİ ÜRETİM SİSTEMLERİ İÇİN ARTIK TERİM TABANLI AKIŞ ZAMANI TAHMİN ALGORİTMASI

RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS

Pages
580–595
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

By this way, the prediction performance of fitted regression model is improved and the lack-of-fit is decreased

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Regression-based methods are widely used for flow time estimation of customer orders.
📊
Key Findings & Data:However, for the customer orders that will be produced for the first time in a labor intensive project type production system with new design parameters, it is hard to make thoroughly accurate flow time prediction at the quotation stage.
💡
Conclusion & Impact:By this way, the prediction performance of fitted regression model is improved and the lack-of-fit is decreased
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:regresyon analizi · yapay sinir ağları · akış zamanı

Abstract

Regression-based methods are widely used for flow time estimation of customer orders. However, for the customer orders that will be produced for the first time in a labor intensive project type production system with new design parameters, it is hard to make thoroughly accurate flow time prediction at the quotation stage. This is caused by having so many uncontrollable factors in a production system, that are not placed in the mathematical models. These uncontrollable factors cause high differences between the observed and expected flow time. In this study, a new algorithm - that combines the regression analysis and the artificial neural networks - is proposed. By this way, the prediction performance of fitted regression model is improved and the lack-of-fit is decreased

Özet

Regresyon tabanlı metodlar, müşteri siparişlerinin akış zamanının hesaplanmasında yaygın olarak kullanılmaktadır. Ancak emek yoğun proje tipi üretim yapan işletmelerde, ilk defa yeni tasarım parametreleri ile üretilecek olan ürünlerin akış zamanını, üretime başlamadan önce müşteriye fiyat teklifi verme aşamasında tahmin etmek zor bir problemdir. Bu durum, üretim sisteminin matematiksel modellerde yer verilemeyen pek çok kontrol edilemeyen değişken içermesinden kaynaklanır. Bu kontrol edilemeyen değişkenler ise beklenen akış zamanı ile regresyon tabanlı denklemlerle tahmin edilen zamanlar arasında hatırı sayılır bir tahmin hatasını ortaya çıkarır. Bu çalışmada, regresyon denkleminin tahmin hatasını minimize etmek üzere, yapay sinir ağları ile regresyon analizini birleştiren bir algoritma önerilmiştir. Bu yolla regresyon denkleminin tahmin performansı arttırılmış ve tahmin hataları minimize edilmiştir

🔖

Cite This Article

KARAOĞLAN, A. D. (2016). EMEK YOĞUN ÇALIŞILAN PROJE TİPİ ÜRETİM SİSTEMLERİ İÇİN ARTIK TERİM TABANLI AKIŞ ZAMANI TAHMİN ALGORİTMASI. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi, Cilt: 18 - Sayı: 54, 580–595. https://ajindex.com/articles/210363

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (9)

  1. Ragatz GL, Mabert VA. A Simulation Analysis of Due Date Assignment Rules, Journal of Operations Management, Cilt. 5, 1984, s. 27–39.
  2. Vig MM, Dooley KJ. Mixing Static and Dynamic Flow Time Estimates for Due-Date Assignment, Journal of Operations Management, Cilt. 11, 1993, s. 67–79.
  3. Arizono I, Yamamoto A, Ohta H. Scheduling for Minimizing Total Actual Flow Time by Neural Networks, International Journal of Production Research, Cilt. 30, 1992, s. 503–511. Enns ST. A Dynamic Forecasting Model for Job Shop Flowtime Prediction and Tardiness Control, International Journal of Production Research, Cilt. 33, No. 5, 1995, s. 1295–1312. Harris CR. Modelling the Impact of Design, Tactical, and Operational Factors on Manufacturing System Performance, International Journal of Production Research, Cilt. 35, No. 2, 1997, s. 479-499. Veral EA. Computer Simulation of Due-Date Setting in Multi-Machine Job Shops, Computers & Industrial Engineering, Cilt. 41, No. 1, 2001, s. 77-94.
  4. Govind N, Roeder TM. Estimating Expected Completion Times with Probabilistic Job Routing, Proceedings of the 2006
  5. Winter Simulation Conference, Cilt. 1, No. 5, Winter Simulation Conference, Monterey, CA, Dec 03-06, 2006, s. 1804-1810.
  6. Li S, Li Y, Liu Y et al. A GA-Based NN Approach for Makespan Estimation, Applied Mathematics and Computation, Cilt. 185, No. 2, 2007, s. 1003-1014.
  7. Alenezi A., Moses SA, Trafalis TB. Real-Time Prediction of Order Flow Times Using Support Vector Regression, Computers & Operations Research, Cilt. 35, No. 11, 2008, s. 3489-3503.
  8. Asadzadeh SM, Azadeh A, Ziaeifar AA. Neuro-Fuzzy-Regression Algorithm for Improved Prediction of Manufacturing Lead Time with Machine Breakdowns, Concurrent Engineering-Research and Applications, Cilt. 19, No. 4, 2011, s. 269-281. Chen T, and Wang YC. An Iterative Procedure for Optimizing the Performance of the Fuzzy-Neural Job Cycle Time Estimation Approach in a Wafer Fabrication Factory, Mathematical Problems in Engineering, Article 2013, Article Number: 740478. Kumru M, Kumru PY. Using Artificial Neural Networks to Forecast Operation Times in Metal Industry, International Journal of Computer Integrated Manufacturing, Cilt. 27, No. 1, 2014, s. 48-59. Pan Q, and Dong Y. An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation, Information Sciences, Cilt. 277, 2014, s. 643-655.
  9. Ribas I, Companys R, Tort-Martorell X. An efficient Discrete Artificial Bee Colony algorithm for the blocking flow shop pro