THE COMPARISON OF PRILIMINARY-COST ESTIMATION METHODS USED IN CONSTRUCTION SECTOR

İNŞAAT SEKTÖRÜNDE KULLANILAN ÖN MALİYET TAHMİN YÖNTEMLERİNİN KARŞILAŞTIRILMASI

Pages
263–272
Publication Date
2012-02-01
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

According to the results of the study, most known methods in Turkey are the methods based on comparison of similar projects while the most used methods are the methods based on average cost of unit area.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this study, cost estimation methods used in pre-design phase of construction projects are evaluated with regard to their awareness and usage rates in Turkey construction sector.
📊
Key Findings & Data:Firstly, scope and components of cost concept for construction projects are mentioned and then cost estimation methods used in pre-design stage of construction projects are discussed briefly.
💡
Conclusion & Impact:According to the results of the study, most known methods in Turkey are the methods based on comparison of similar projects while the most used methods are the methods based on average cost of unit area.
🔬Design:Makale
📍Scope:Comprehensive Sample
⚙️Variables:Maliyet Tahmini · Maliyet Kontrol · Maliyet Tahmin Yöntemleri

Abstract

In this study, cost estimation methods used in pre-design phase of construction projects are evaluated with regard to their awareness and usage rates in Turkey construction sector. Firstly, scope and components of cost concept for construction projects are mentioned and then cost estimation methods used in pre-design stage of construction projects are discussed briefly. Lastly, the results of a poll study about the awareness and usage levels of those methods in our country are exposed. According to the results of the study, most known methods in Turkey are the methods based on comparison of similar projects while the most used methods are the methods based on average cost of unit area.

Özet

Bu çalışmada inşaat sektöründe kullanılan ön maliyet tahmin yöntemleri ülkemizdeki bilinilirlikleri ve kullanım oranları açısından değerlendirilmiştir. Bu kapsamda ilk olarak inşaat projesinde maliyet kavramı, kapsamı ve bileşenlerine değinilmiş, daha sonra yapılan araştırmalar ve incelemeler ışığında inşaat sektöründe ön tasarım evresinde kullanılan maliyet tahmin yöntemlerinden genel olarak bahsedilmiştir. Son olarak bu yöntemlerin ülkemizdeki kullanılırlık ve bilinirlik oranlarının belirlenmesi amacıyla yapılan anket çalışmasının sonuçları ortaya konmuştur. Buna göre ülkemizde en çok bilenen yöntemlerin benzer proje ile karşılaştırmaya dayalı yöntemler olduğu, kullanım oranları açısından ise en fazla ortalama birim alan maliyetine dayalı ön tahmin yönteminin ön plana çıktığı görülmektedir

🔖

Cite This Article

Topkaya, E., Yönez, E., Kuruoğlu, M., Çelik, L. Y. (2012). THE COMPARISON OF PRILIMINARY-COST ESTIMATION METHODS USED IN CONSTRUCTION SECTOR. Engineering Sciences, Cilt: 7 Sayı: 1, 263–272. https://doi.org/10.12739/nwsaes.v7i1.5000066887