Journals / Cankaya University Journal of Science and Engineering / 2026 / Volume: 23 Issue: 1

Integrated Production and Distribution Scheduling: A Systematic Review of Problem Characteristics and Solution Methods

Bütünleşik Üretim ve Sevkiyat Çizelgeleme: Problem Karakteristikleri ve Çözüm Yöntemlerine Yönelik Sistematik Bir İnceleme

Pages
—
Publication Date
2026-05-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

We highlight the current state of the art and future directions of the IPDS problem.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:The integrated approach to scheduling production and distribution activities, along with the development of solution methods, has been extensively studied due to industrial demand.
📊
Key Findings & Data:This paper presents a systematic review of the classification characteristics of integrated production and distribution scheduling (IPDS).
💡
Conclusion & Impact:We highlight the current state of the art and future directions of the IPDS problem.
🔬Design:Review & Systematic Survey
📍Scope:2010 Verileri
⚙️Variables:Integrated Production and Distribution Scheduling · Systematic Review · Scheduling

Abstract

The integrated approach to scheduling production and distribution activities, along with the development of solution methods, has been extensively studied due to industrial demand. This paper presents a systematic review of the classification characteristics of integrated production and distribution scheduling (IPDS). The granular decomposition method is utilized as the systematic review methodology. We provide a classification of problem characteristics and solution methods to identify research trends and gaps. The research was conducted using two primary search databases: Scopus and Web of Science (WoS). In total, we identify relevant articles published between 2010 and 2025. We highlight the current state of the art and future directions of the IPDS problem.

Özet

Üretim ve dağıtım faaliyetlerinin entegre şekilde çizelgelenmesine yönelik bütünleşik yaklaşım ve bu alandaki çözüm yöntemlerinin geliştirilmesi, endüstrinin talebine yönelik olarak yoğun bir şekilde incelenmiştir. Bu makale, bütünleşik üretim ve sevkiyat çizelgelemesine (BÜSÇ) ilişkin sınıflandırma özelliklerinin sistematik bir incelemesini sunmaktadır. Araştırma eğilimlerini ve boşluklarını tespit etmek amacıyla problem karakteristikleri ve çözüm yöntemlerine dair bir sınıflandırma sunulmaktadır. Araştırma, Scopus ve Web of Science (WoS) olmak üzere iki birincil arama veri tabanı kullanılarak yürütülmüştür. 2010 ile 2025 yılları arasında yayımlanan toplam ilgili makaleler belirlenmiştir. Çalışmada, BÜSÇ probleminin mevcut son durumu ve geleceğe yönelik yönelimleri vurgulanmaktadır.

🔖

Cite This Article

Türel, O., Görür, A. K., Çetinkaya, F. C. (2026). Integrated Production and Distribution Scheduling: A Systematic Review of Problem Characteristics and Solution Methods. Cankaya University Journal of Science and Engineering, Volume: 23 Issue: 1. https://ajindex.com/articles/1468607

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (106)

  1. L. C. Coelho, and J. Renaud, “Integrated production-distribution systems: Trends and perspectives,” Pesquisa Operacional, vol. 41, no. Special Issue, 2021, doi: 10.1590/0101-7438.2021.041S1.00246080.
  2. W. Piotrowicz and R. Cuthbertson, “Introduction to the special issue information technology in retail: Toward omnichannel retailing,” 2014. doi: 10.2753/JEC1086-4415180400.
  3. M. Benbouja, A. Touil, A. Echchatbi, and A. Charkaoui, “Supply chain integration within mass customization: Tactical procurement, production and distribution modeling,” Journal of Industrial Engineering and Management, vol. 14, no. 2, 2021, doi: 10.3926/jiem.3182.
  4. M. Asghari and S. M. J. Mirzapour Al-e-hashem, “Green vehicle routing problem: A state-of-the-art review,” 2021. doi: 10.1016/j.ijpe.2020.107899.
  5. S. Sabet and B. Farooq, “Green Vehicle Routing Problem: State of the Art and Future Directions,” 2022. doi: 10.1109/ACCESS.2022.3208899.
  6. M. Grazia Speranza, “Trends in transportation and logistics,” Eur. J. Oper. Res., vol. 264, no. 3, 2018, doi: 10.1016/j.ejor.2016.08.032.
  7. M. Soysal, M. Çimen, S. Belbağ, and E. Toğrul, “A review on sustainable inventory routing,” Comput. Ind. Eng., vol. 132, 2019, doi: 10.1016/j.cie.2019.04.026.
  8. T. Liang, L. Zhou, and Z. Jiang, “Integrated Scheduling of Production and Material Delivery in a Make-to-order Flow Shop,” in IEEE International Conference on Industrial Engineering and Engineering Management, 2022. doi: 10.1109/IEEM55944.2022.9989966.
  9. F. Yao, B. Alkan, B. Ahmad, and R. Harrison, “Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation,” Sensors (Switzerland), vol. 20, no. 21, 2020, doi: 10.3390/s20216333.
  10. S. Vinodh and S. Aravindraj, “Evaluation of leagility in supply chains using fuzzy logic approach,” Int. J. Prod. Res., vol. 51, no. 4, 2013, doi: 10.1080/00207543.2012.693960.
  11. C. Chen, T. Lee Kong, and W. Kan, “Identifying the promising production planning and scheduling method for manufacturing in Industry 4.0: a literature review,” Prod. Manuf. Res., vol. 11, no. 1, 2023, doi: 10.1080/21693277.2023.2279329.
  12. A. A. Othman, V. P. Kaliani Sundram, N. M. Sayuti, and A. S. Bahrin, “The relationship between supply chain integration, just-in-time and logistics performance: A supplier’s perspective on the automotive industry in Malaysia,” International Journal of Supply Chain Management, vol. 5, no. 1, 2016.
  13. K. Braekers, K. Ramaekers, and I. Van Nieuwenhuyse, “The vehicle routing problem: State of the art classification and review,” 2016. doi: 10.1016/j.cie.2015.12.007.
  14. A. Arulselvan, K. Akartunalı, and W. van den Heuvel, “Economic lot-sizing problem with remanufacturing option: complexity and algorithms,” Optim. Lett., vol. 16, no. 2, 2022, doi: 10.1007/s11590-021-01768-3.
  15. N. Boysen, R. de Koster, and F. Weidinger, “Warehousing in the e-commerce era: A survey,” 2019. doi: 10.1016/j.ejor.2018.08.023.
  16. Z. L. Chen, “Integrated production and outbound distribution scheduling: Review and extensions,” 2010. doi: 10.1287/opre.1080.0688.
  17. R. Kumar, L. Ganapathy, R. Gokhale, and M. K. Tiwari, “Quantitative approaches for the integration of production and distribution planning in the supply chain: a systematic literature review,” 2020. doi: 10.1080/00207543.2020.1762019.
  18. J. Lohmer and R. Lasch, “Production planning and scheduling in multi-factory production networks: a systematic literature review,” 2021. doi: 10.1080/00207543.2020.1797207.
  19. U. R. de Oliveira, L. S. Espindola, I. R. da Silva, I. N. da Silva, and H. M. Rocha, “A systematic literature review on green supply chain management: Research implications and future perspectives,” 2018. doi: 10.1016/j.jclepro.2018.03.083.
  20. N. S. Aydin and E. B. Tirkolaee, “A systematic review of aggregate production planning literature with an outlook for sustainability and circularity,” Environ. Dev. Sustain., 2022, doi: 10.1007/s10668-022-02304-8.
  21. D. Tranfield, D. Denyer, and P. Smart, “Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review,” 2003. doi: 10.1111/1467-8551.00375.
  22. Z. Li, H. Yu, and S. Zhou, “Exact and heuristic solution approaches for integrated production and distribution problem of perishable products with customization,” Journal of the Operational Research Society, 2022, doi: 10.1080/01605682.2022.2104667.
  23. S. Waffenschmidt, M. Knelangen, W. Sieben, S. Bühn, and D. Pieper, “Single screening versus conventional double screening for study selection in systematic reviews: A methodological systematic review,” BMC Med. Res. Methodol., vol. 19, no. 1, 2019, doi: 10.1186/s12874-019-0782-0.
  24. Y. Zou, Z. Lin, D. Han, T. C. E. Cheng, and C. C. Wu, “Two-Agent Integrated Scheduling of Production and Distribution Operations With Fixed Departure Times,” Journal of Industrial and Management Optimization, vol. 18, no. 2, 2022, doi: 10.3934/jimo.2021005.
  25. W. Zhong, Z. L. Chen, and M. Chen, “Integrated production and distribution scheduling with committed delivery dates,” Operations Research Letters, vol. 38, no. 2, pp. 133–138, Mar. 2010, doi: 10.1016/j.orl.2009.11.007.
  26. J. Long, P. M. Pardalos, and C. Li, “Level-based multi-objective particle swarm optimizer for integrated production scheduling and vehicle routing decision with inventory holding, delivery, and tardiness costs,” Int. J. Prod. Res., vol. 60, no. 11, 2022, doi: 10.1080/00207543.2021.1919780.
  27. Y. C. Chang, V. C. Li, and C. J. Chiang, “An ant colony optimization heuristic for an integrated production and distribution scheduling problem,” Engineering Optimization, vol. 46, no. 4, 2014, doi: 10.1080/0305215X.2013.786062.
  28. Y. Kergosien, M. Gendreau, and J. C. Billaut, “A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints,” Eur. J. Oper. Res., vol. 262, no. 1, 2017, doi: 10.1016/j.ejor.2017.03.028.
  29. H. Kazemi, M. Mahdavi Mazdeh, M. Rostami, and M. Heydari, “The integrated production-distribution scheduling in parallel machine environment by using improved genetic algorithms,” Journal of Industrial and Production Engineering, vol. 38, no. 3, 2021, doi: 10.1080/21681015.2020.1848930.
  30. D. Liu, W. Wang, L. Huang, and D. Proverbs, “Coordinated Production and Delivery Operations with Parallel Machines and Multiple Vehicles,” IEEE Access, vol. 8, 2020, doi: 10.1109/ACCESS.2019.2958742.
  31. G. H. Wu, C. Y. Cheng, P. Pourhejazy, and B. L. Fang, “Variable neighborhood-based Cuckoo Search for production routing with time window and setup times,” Appl. Soft Comput., vol. 125, 2022, doi: 10.1016/j.asoc.2022.109191.
  32. M. Du, N. Kong, and X. Hu, “A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains,” INFOR, vol. 57, no. 2, 2019, doi: 10.1080/03155986.2018.1533773.
  33. H. Liu, Z. Guo, and Z. Zhang, “A hybrid multi-level optimisation framework for integrated production scheduling and vehicle routing with flexible departure time,” Int. J. Prod. Res., vol. 59, no. 21, 2021, doi: 10.1080/00207543.2020.1821927.
  34. Y. Hou, H. Wang, and X. Huang, “A Q-learning-based multi-objective evolutionary algorithm for integrated green production and distribution scheduling problems,” Eng. Appl. Artif. Intell., vol. 127, Jan. 2024, doi: 10.1016/j.engappai.2023.107434.
  35. E. Yağmur and S. E. Kesen, “Multi-trip heterogeneous vehicle routing problem coordinated with production scheduling: Memetic algorithm and simulated annealing approaches,” Comput. Ind. Eng., vol. 161, 2021, doi: 10.1016/j.cie.2021.107649.
  36. H. Chevroton, S. U. K. Rohmer, and J. C. Billaut, “A production and distribution framework: Manufacturer dominates,” Comput. Ind. Eng., vol. 155, 2021, doi: 10.1016/j.cie.2021.107162.
  37. F. Marandi and S. H. Zegordi, “Integrated production and distribution scheduling for perishable products,” Scientia Iranica, vol. 24, no. 4, 2017, doi: 10.24200/sci.2017.4298.
  38. M. Steinrücke, “Integrated production, distribution and scheduling in the aluminium industry: A continuous-time MILP model and decomposition method,” Int. J. Prod. Res., vol. 53, no. 19, 2015, doi: 10.1080/00207543.2015.1023401.
  39. W. Tan, X. Yuan, J. Wang, H. Xu, and L. Wu, “Multi-objective teaching–learning-based optimization algorithm for carbon-efficient integrated scheduling of distributed production and distribution considering shared transportation resource,” J. Clean. Prod., vol. 406, 2023, doi: 10.1016/j.jclepro.2023.137061.
  40. Y. Jia, W. Wang, and J. Zhang, “A learning-and-knowledge-assisted multi-population collaborative evolutionary algorithm for integrated design-production-distribution scheduling problems in mass personalized customization,” Swarm Evol. Comput., vol. 99, Dec. 2025, doi: 10.1016/j.swevo.2025.102158.
  41. D. Marković, A. Stanković, D. Marinković, and D. Pamučar, “Metaheuristic Algorithms for the Optimization of Integrated Production Scheduling and Vehicle Routing Problems in Supply Chains,” Tehnicki Vjesnik, vol. 31, no. 3, pp. 800–807, 2024, doi: 10.17559/TV-20240207001318.
  42. S. Li and M. Li, “Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders,” J. Inequal. Appl., vol. 2014, no. 1, 2014, doi: 10.1186/1029-242X-2014-409.
  43. C. Viergutz and S. Knust, “Integrated production and distribution scheduling with lifespan constraints,” Ann. Oper. Res., vol. 213, no. 1, pp. 293–318, Feb. 2014, doi: 10.1007/s10479-012-1197-z.
  44. B. Cheng, J. Gao, M. Zhou, and W. Chu, “Integrated scheduling of production and distribution with two competing agents,” Journal of the Operational Research Society, vol. 75, no. 9, pp. 1826–1836, 2024, doi: 10.1080/01605682.2023.2277867.
  45. Q. Luo, Q. Fan, Q. Deng, X. Guo, G. Gong, and X. Liu, “Solving bi-objective integrated scheduling problem of production, inventory and distribution using a modified NSGA-II,” Expert Syst. Appl., vol. 225, 2023, doi: 10.1016/j.eswa.2023.120074.
  46. Y. Arda, D. Cattaruzza, V. François, and M. Ogier, “Home chemotherapy delivery: An integrated production scheduling and multi-trip vehicle routing problem,” Eur. J. Oper. Res., vol. 317, no. 2, pp. 468–486, Sep. 2024, doi: 10.1016/j.ejor.2024.03.039.
  47. V. Abdollahzadeh, I. Nakhaikamalabadi, S. M. Hajimolana, and S. H. Zegordi, “A multifactory integrated production and distribution scheduling problem with parallel machines and immediate shipments solved by improved whale optimization algorithm,” Complexity, vol. 2018, 2018, doi: 10.1155/2018/5120640.
  48. R. F. T. Neto, H. T. A. Dantas, and J. K. Sagawa, “The influence of shelf life on the integrated production scheduling and vehicle routing optimization for perishable products,” European J. of Industrial Engineering, vol. 18, no. 6, 2024, doi: 10.1504/ejie.2024.10058090.
  49. E. Yağmur and S. E. Kesen, “Integrated production scheduling and vehicle routing problem with energy efficient strategies: Mathematical formulation and metaheuristic algorithms,” Expert Syst. Appl., 2023, doi: 10.1016/j.eswa.2023.121586.
  50. T. Azad, H. F. Rahman, R. K. Chakrabortty, and M. J. Ryan, “Optimization of integrated production scheduling and vehicle routing problem with batch delivery to multiple customers in supply chain,” Memet. Comput., vol. 14, no. 3, 2022, doi: 10.1007/s12293-022-00372-x.
  51. I. Averbakh, “On-line integrated production-distribution scheduling problems with capacitated deliveries,” Eur. J. Oper. Res., vol. 200, no. 2, 2010, doi: 10.1016/j.ejor.2008.12.030.
  52. B. Bilgen and Y. Çelebi, “Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling,” Ann. Oper. Res., vol. 211, no. 1, 2013, doi: 10.1007/s10479-013-1415-3.
  53. M. Rasti-Barzoki and S. R. Hejazi, “Pseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain scheduling,” Appl. Math. Model., vol. 39, no. 12, pp. 3280–3289, Jun. 2015, doi: 10.1016/j.apm.2014.11.031.
  54. L. L. Fu, M. A. Aloulou, and C. Triki, “Integrated production scheduling and vehicle routing problem with job splitting and delivery time windows,” Int. J. Prod. Res., vol. 55, no. 20, 2017, doi: 10.1080/00207543.2017.1308572.
  55. F. Jafari Nozar and J. Behnamian, “Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality,” Engineering Optimization, vol. 53, no. 11, pp. 1902–1921, 2021, doi: 10.1080/0305215X.2020.1837792.
  56. M. Ganji, H. Kazemipoor, S. M. Hadji Molana, and S. M. Sajadi, “A green multi-objective integrated scheduling of production and distribution with heterogeneous fleet vehicle routing and time windows,” J. Clean. Prod., vol. 259, Jun. 2020, doi: 10.1016/j.jclepro.2020.120824.
  57. C. Viergutz, “Integrated Production and Distribution Scheduling,” 2011.
  58. L. Lei, S. Liu, A. Ruszczynski, and S. Park, “On the integrated production, inventory, and distribution routing problem,” IIE Transactions (Institute of Industrial Engineers), vol. 38, no. 11, 2006, doi: 10.1080/07408170600862688.
  59. C. Meinecke and B. Scholz-Reiter, “A Heuristic for the Integrated Production and Distribution Scheduling Problem,” International Journal of Mechanical, Industrial Science and Engineering, vol. 1, no. 2, 2014.
  60. J. Ehm, M. Freitag, and E. M. Frazzon, “A Heuristic Optimisation Approach for the Scheduling of Integrated Manufacturing and Distribution Systems,” in Procedia CIRP, 2016. doi: 10.1016/j.procir.2016.11.062.
  61. A. Peiris, F. K. P. Hui, C. Duffield, and T. Ngo, “Production scheduling in modular construction: Metaheuristics and future directions,” 2023. doi: 10.1016/j.autcon.2023.104851.
  62. B. P. S. and J. T. Jarboui, “Metaheuristics for production scheduling,” John Wiley & Sons, 2013.
  63. M. Iori and S. Martello, Metaheuristics for Scheduling in Industrial and Manufacturing Applications, vol. 128. 2008.
  64. M. Tonizza Pereira and M. Seido Nagano, “Hybrid metaheuristics for the integrated and detailed scheduling of production and delivery operations in no-wait flow shop systems,” Comput. Ind. Eng., vol. 170, 2022, doi: 10.1016/j.cie.2022.108255.
  65. R. Ramezanian, M. H. Mahdavi, and S. Shahparvari, “Integrated mobile facility production and distribution scheduling planning; A synchronized solution framework,” Appl. Math. Comput., vol. 494, Jun. 2025, doi: 10.1016/j.amc.2025.129277.
  66. G. Can Atasagun and İ. Karaoğlan, “Solution approaches for the integrated production and outbound distribution scheduling problem with multiple plants and perishable items,” Expert Syst. Appl., vol. 237, Mar. 2024, doi: 10.1016/j.eswa.2023.121318.
  67. M. Sidki, N. Tchernev, P. Féniès, L. Ren, and S. Elfirdoussi, “A monolithic batch-centric MILP approach for a real-world integrated production and pipeline distribution scheduling problem,” Comput. Ind. Eng., vol. 203, May 2025, doi: 10.1016/j.cie.2025.111028.
  68. M. Xu, F. Yang, and L. Lin, “Limited integrated production scheduling and vehicle routing in the steel industry,” Journal of Scheduling, vol. 28, no. 4, pp. 445–467, Aug. 2025, doi: 10.1007/s10951-025-00841-4.
  69. K. Zhang and B. Zhou, “A self-adaptive Gaussian mutation-based arithmetic optimiser algorithm for integrated production scheduling and vehicle routing problem in the distributed manufacturing environment,” Int. J. Prod. Res., vol. 62, no. 21, pp. 7952–7980, 2024, doi: 10.1080/00207543.2024.2334416.
  70. G. Can Atasagun and İ. Karaoğlan, “Integrated production and outbound distribution scheduling problem with multiple facilities/vehicles and perishable items,” Appl. Soft Comput., vol. 166, Nov. 2024, doi: 10.1016/j.asoc.2024.112144.
  71. M. Horváth, “New computational results for integrated production and outbound distribution scheduling problems for a product with a short lifespan,” EURO Journal on Computational Optimization, vol. 12, Jan. 2024, doi: 10.1016/j.ejco.2024.100095.
  72. M. Huang, S. Huang, B. Du, J. Guo, and Y. Li, “Fuzzy Superposition Operation and Knowledge-driven Co-evolutionary Algorithm for Integrated Production Scheduling and Vehicle Routing Problem with Soft Time Windows and Fuzzy Travel Times,” IEEE Transactions on Fuzzy Systems, 2024, doi: 10.1109/TFUZZ.2024.3388003.
  73. F. Qiu, N. Geng, and H. Wang, “An improved memetic algorithm for integrated production scheduling and vehicle routing decisions,” Comput. Oper. Res., vol. 152, Apr. 2023, doi: 10.1016/j.cor.2022.106127.
  74. M. Huang, B. Du, and J. Guo, “A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows,” Comput. Oper. Res., vol. 159, 2023, doi: 10.1016/j.cor.2023.106346.
  75. J. Guo, W. Liu, Z. Peng, and B. Du, “Integrated scheduling of distributed production and distribution in group manufacturing with uncertain travel time,” Complex and Intelligent Systems, vol. 9, no. 2, pp. 1871–1889, Apr. 2023, doi: 10.1007/s40747-022-00875-7.
  76. W. Tan, X. Yuan, J. Wang, H. Xu, and L. Wu, “Multi-objective teaching–learning-based optimization algorithm for carbon-efficient integrated scheduling of distributed production and distribution considering shared transportation resource,” J. Clean. Prod., vol. 406, Jun. 2023, doi: 10.1016/j.jclepro.2023.137061.
  77. M. Bank, M. Mahdavi Mazdeh, M. Heydari, and E. Teimoury, “Coordinating lot sizing and integrated production and distribution scheduling with batch delivery and holding cost,” Kybernetes, vol. 51, no. 3, 2022, doi: 10.1108/K-10-2020-0697.
  78. H. Qin, T. Li, Y. Teng, and K. Wang, “Integrated production and distribution scheduling in distributed hybrid flow shops,” Memet. Comput., vol. 13, no. 2, 2021, doi: 10.1007/s12293-021-00329-6.
  79. G. Wang, “Integrated supply chain scheduling of procurement, production, and distribution under spillover effects,” Comput. Oper. Res., vol. 126, Feb. 2021, doi: 10.1016/j.cor.2020.105105.
  80. E. Yağmur and S. E. Kesen, “A memetic algorithm for joint production and distribution scheduling with due dates,” Comput. Ind. Eng., vol. 142, 2020, doi: 10.1016/j.cie.2020.106342.
  81. N. A. Masruroh, H. A. Fauziah, and S. R. Sulistyo, “Integrated production scheduling and distribution allocation for multi-products considering sequence-dependent setups: a practical application,” Production Engineering, vol. 14, no. 2, 2020, doi: 10.1007/s11740-020-00954-z.
  82. R. E. Rasi and M. Jeihouni, “Production and distribution scheduling optimisation in a three-stage integrated supply chain using genetic algorithm Production and distribution scheduling optimisation,” 2020.
  83. F. Marandi and S. M. T. Fatemi Ghomi, “Integrated multi-factory production and distribution scheduling applying vehicle routing approach,” Int. J. Prod. Res., vol. 57, no. 3, 2019, doi: 10.1080/00207543.2018.1481301.
  84. Z. He, Z. Guo, and J. Wang, “Integrated scheduling of production and distribution operations in a global MTO supply chain,” Enterp. Inf. Syst., vol. 13, no. 4, pp. 490–514, Apr. 2019, doi: 10.1080/17517575.2018.1428770.
  85. A. Gharaei and F. Jolai, “A branch and price approach to the two-agent integrated production and distribution scheduling,” Comput. Ind. Eng., vol. 136, 2019, doi: 10.1016/j.cie.2019.07.050.
  86. X. Zou, L. Liu, K. Li, and W. Li, “A coordinated algorithm for integrated production scheduling and vehicle routing problem,” Int. J. Prod. Res., vol. 56, no. 15, pp. 5005–5024, Aug. 2018, doi: 10.1080/00207543.2017.1378955.
  87. T. Sawik, “Integrated selection of supply portfolio and scheduling of production and distribution,” in International Series in Operations Research and Management Science, vol. 256, Springer New York LLC, 2018, pp. 149–185. doi: 10.1007/978-3-319-58823-0_6.
  88. B. Cheng, J. Pei, K. Li, and P. M. Pardalos, “Integrated scheduling of production and distribution for manufacturers with parallel batching facilities,” Optim. Lett., vol. 12, no. 7, pp. 1609–1623, Oct. 2018, doi: 10.1007/s11590-017-1201-2.
  89. L. L. Fu, M. A. Aloulou, and C. Artigues, “Integrated production and outbound distribution scheduling problems with job release dates and deadlines,” Journal of Scheduling, vol. 21, no. 4, 2018, doi: 10.1007/s10951-017-0542-0.
  90. A. Noroozi, M. M. Mazdeh, M. Heydari, and M. Rasti-Barzoki, “Coordinating order acceptance and integrated production-distribution scheduling with batch delivery considering Third Party Logistics distribution,” J. Manuf. Syst., vol. 46, 2018, doi: 10.1016/j.jmsy.2017.11.001.
  91. S. Mohammadi, A. Cheraghalikhani, and R. Ramezanian, “A joint scheduling of production and distribution operations in a flow shop manufacturing system,” Scientia Iranica, vol. 25, no. 2E, pp. 911–930, Mar. 2018, doi: 10.24200/sci.2017.4437.
  92. R. Yan, M. M. Li, and W. C. Wei, “Integrated production scheduling and distribution planning with a two-stage semi-continuous flow shop environment,” International Journal of Simulation Modelling, vol. 17, no. 3, 2018, doi: 10.2507/IJSIMM17(3)CO15.
  93. A. Gharaei and F. Jolai, “A multi-agent approach to the integrated production scheduling and distribution problem in multi-factory supply chain,” Applied Soft Computing Journal, vol. 65, 2018, doi: 10.1016/j.asoc.2018.02.002.
  94. S. Porselvi, A. N. Balaji, and N. Jawahar, “Artificial immune system and particle swarm optimisation algorithms for an integrated production and distribution scheduling problem,” International Journal of Logistics Systems and Management, vol. 30, no. 1, 2018, doi: 10.1504/IJLSM.2018.091451.
  95. P. Devapriya, W. Ferrell, and N. Geismar, “Integrated production and distribution scheduling with a perishable product,” Eur. J. Oper. Res., vol. 259, no. 3, 2017, doi: 10.1016/j.ejor.2016.09.019.
  96. B. Y. Cheng, J. Y. T. Leung, and K. Li, “Integrated scheduling on a batch machine to minimize production, inventory and distribution costs,” Eur. J. Oper. Res., vol. 258, no. 1, pp. 104–112, Apr. 2017, doi: 10.1016/j.ejor.2016.09.009.
  97. X. Feng, Y. Cheng, F. Zheng, and Y. Xu, “Online integrated production–distribution scheduling problems without preemption,” J. Comb. Optim., vol. 31, no. 4, pp. 1569–1585, May 2016, doi: 10.1007/s10878-015-9841-6.
  98. T. Sawik, “Integrated supply, production and distribution scheduling under disruption risks,” Omega (United Kingdom), vol. 62, pp. 131–144, Jul. 2016, doi: 10.1016/j.omega.2015.09.005.
  99. X. Zhong and D. Jiang, “Integrated Scheduling of Production and Distribution with Release Dates and Capacitated Deliveries,” Math. Probl. Eng., vol. 2016, 2016, doi: 10.1155/2016/9315197.
  100. N. Jamili, M. Ranjbar, and M. Salari, “A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions,” J. Manuf. Syst., vol. 40, 2016, doi: 10.1016/j.jmsy.2016.06.005.
  101. J. Hao, L. Cao, and D. Jiang, “Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers,” Math. Probl. Eng., vol. 2015, 2015, doi: 10.1155/2015/579893.
  102. S. Gao, L. Qi, and L. Lei, “Integrated batch production and distribution scheduling with limited vehicle capacity,” Int. J. Prod. Econ., vol. 160, 2015, doi: 10.1016/j.ijpe.2014.08.017.
  103. W. Zhong, “An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates,” Optim. Lett., vol. 9, no. 3, pp. 537–567, Mar. 2015, doi: 10.1007/s11590-014-0755-5.
  104. B. Y. Cheng, J. Y. T. Leung, and K. Li, “Integrated scheduling of production and distribution to minimize total cost using an improved ant colony optimization method,” Comput. Ind. Eng., vol. 83, pp. 217–225, May 2015, doi: 10.1016/j.cie.2015.02.017.
  105. S. Li and M. Li, “Integrated production and distribution scheduling problems related to fixed delivery departure dates and weights of late orders,” Scientific World Journal, vol. 2015, 2015, doi: 10.1155/2015/804968.
  106. C. T. Ng and L. Lu, “On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time,” Journal of Scheduling, vol. 15, no. 3, 2012, doi: 10.1007/s10951-011-0260-y.