Journals / Business and Economics Research Journal / 2019 / Cilt: 10 - Sayı: 5

Project Selection Method Based on Balanced Scorecard Framework

Pages
1179–1187
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

The model generates consistent results and can be used by organisations at the project and investment evaluation step.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:Project selection is one of the most important decisions for an organisation to achieve its goals and manage its resources effectively.
📊
Key Findings & Data:The performance of the developed model was tested with randomly generated sample data.
💡
Conclusion & Impact:The model generates consistent results and can be used by organisations at the project and investment evaluation step.
🔬Design:Modeling & Simulation
📍Scope:Comprehensive Sample
⚙️Variables:Domain Parameters

Özet

Project selection is one of the most important decisions for an organisation to achieve its goals and manage its resources effectively. This study aims to develop a project evaluation method using the balanced scorecard (BSC) dimensions. Although the BSC technique has been used in combination with other methods in various fields, such as supplier qualification and project evaluation, the dimensions of the BSC method have not been defined as parameters in the mathematical model of a knapsack problem. By doing so and considering time and budget constraints, the developed mathematical model selects the most suitable projects using the weighted sum of parameters. The performance of the developed model was tested with randomly generated sample data. Sixteen alternatives were assessed to determine the impact of varying dimension coefficients, budgets, project durations and labour requirement constraints to be established by organisations. The model generates consistent results and can be used by organisations at the project and investment evaluation step.

🔖

Cite This Article

YILMAZ, D. E., ANTMEN, Z. F. (2019). Project Selection Method Based on Balanced Scorecard Framework. Business and Economics Research Journal, Cilt: 10 - Sayı: 5, 1179–1187. https://ajindex.com/articles/143238

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...

References (15)

  1. Asosheh, A., Nalchigar, S., & Jamporazmey, M. (2010). Information technology project evaluation: An integrated data envelopment analysis and balanced scorecard approach. Expert Systems with Applications, (37), 5931-5938.
  2. Bailey, A. R., Chow, C. W., & Haddad, K. M. (1999). Continuous improvement in business education: Insights from the for-profit sector and Business School Deans. Journal of Education for Business, 74(3), 165-180.
  3. Basık, F. O. (2012). Rekabet stratejisinde maliyet yönetimi. İstanbul:
  4. Türkmen Kitabevi.
  5. Bhagwat, R., & Sharma, M. K. (2007). Performance measurement of supply chain management: A balanced scorecard approach. Computers & Industrial Engineering, (53), 43-62.
  6. Chang, P. T., & Lee, J. H. (2012). A fuzzy DEA and knapsack formulation integrated model for project selection. Computers and Operations Research, 39, 112-125.
  7. Eilat, H., Golany, B., & Shtub, A. (2008). R&D project evaluation: An integrated DEA and balanced scorecard approach. Omega, (36), 895-912.
  8. Güner, M. F. (2008, 10 1). Bir stratejik yönetim modeli olarak Balanced Scorecard. Gazi Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, 10(1), 247-265.
  9. Kaplan, R. S., & Norton, D. P. (1992, January-February). The balanced scorecard: Measures that drive performance. Harvard Business Review, 70(1), 71-79.
  10. Kaygusuz, S. Y. (2005). Yönetim muhasebesinin performans yönetimi fonksiyonunda geldiği son nokta: Balanced Scorecard. İş, Güç, Endüstri İlişkileri ve İnsan Kaynakları Dergisi, 7(1), 81-103.
  11. Mostamand, M., Hajiagha, H., & Daneshvar, M. (2017). Selecting strategies by considering budget limitation: A hybrid algorithm of SWOT-DEMATEL-ANP and binary programming with grey information. Informatica, 28(3), 485-503.
  12. Shafiee, M., Lotfi, F. H., & Saleh, H. (2014). Supply chain performance evaluation with data envelopment analysis and balanced scorecard approach. Applied Mathematical Modeling, 38(21), 5092-5112.
  13. Simplicio, R., Gomes, J., & Romao, M. (2017). Projects selection and prioritization: A Portuguese Navy Pilot Model. Procedia Computer Science, 121, 72-79.
  14. Singh, S., Olugu, E., Musa, S., & Mahat, A. B. (2018). Fuzzy-based sustainability evaluation method for manufacturing SMEs using balanced scorecard framework. Journal of Intelligent Manufacturing, 29(1), 1-18.
  15. Tan, Y., Zhang, Y., & Khodaverdi, R. (2017). Service performance evaluation using Data Envelopment Analysis and Balance Scorecard Approach: An application to automotive industry. Annals of Operations Research, 248(1),