VERTICAL LINEAR PROJECT SCHEDULING FOR HIGH-RISE BUILDINGS

ÇOKKATLI YAPILAR İÇİN DÜŞEY-DOĞRUSAL PROJE PLANLAMASI

Pages
1093–1098
Publication Date
1999-02-01
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Thus, it could be expected that to show the way of the method to designer and manufacturer about subjects which are activity, priority and sequencing of high-rise project, speeds of activity and construction, completion times, to add or take out some terms to schedule at the state of project changing.

📌 3 Key Takeaways

🎯
Objective & Hypothesis:In this paper, an application to high-rise buildings of VPM (Vertical Production Method) and an example will be given which is composition of two distinct and preferable methods are CPM (Critical Path Method) that is prefering against traditional Bar-Charts or schedules especially in big and costly investments and LOB (Line of Balance) technique that is suitable for using in linear project planning.
📊
Key Findings & Data:In this paper, an application to high-rise buildings of VPM (Vertical Production Method) and an example will be given which is composition of two distinct and preferable methods are CPM (Critical Path Method) that is prefering against traditional Bar-Charts or schedules especially in big and costly investments and LOB (Line of Balance) technique that is suitable for using in linear project planning.
💡
Conclusion & Impact:Thus, it could be expected that to show the way of the method to designer and manufacturer about subjects which are activity, priority and sequencing of high-rise project, speeds of activity and construction, completion times, to add or take out some terms to schedule at the state of project changing.
🔬Design:Makale
📍Scope:Comprehensive Sample
⚙️Variables:Proje planlaması · Zaman çizelgelemesi · Doğrusal projeler

Abstract

In this paper, an application to high-rise buildings of VPM (Vertical Production Method) and an example will be given which is composition of two distinct and preferable methods are CPM (Critical Path Method) that is prefering against traditional Bar-Charts or schedules especially in big and costly investments and LOB (Line of Balance) technique that is suitable for using in linear project planning. Thus, it could be expected that to show the way of the method to designer and manufacturer about subjects which are activity, priority and sequencing of high-rise project, speeds of activity and construction, completion times, to add or take out some terms to schedule at the state of project changing.

Özet

Bu makalede, doğrusal proje planlamasında ve özellikle büyük, yapımı doğrusal, maliyeti yüksek yatırımlara uygun proje izleme tekniği olan LOB'un (Denge-Devre Diyagramları) geleneksel CPM'le (Kritik Yol Yöntemi) karma bir örneği biçimindeki VPM'in (Düşey Üretim Yöntemi) yüksek binalara uygulanışı verilmeye çalışılmıştır. Bu şekilde tanıtılan yöntemin, projelere karar veren ve yapımını yöneten kişilere projelerin işlemleri, öncelik ve ardışıklıkları ile hız, yapım ve tamamlanma sürelerine karar vermede sözkonusu projelerin plan değişikliği ve düzenlenme aşamalarında yardımcı olarak yol göstermesi amaçlanmıştır.

🔖

Cite This Article

Özdemir, İ. (1999). VERTICAL LINEAR PROJECT SCHEDULING FOR HIGH-RISE BUILDINGS. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, Cilt: 5 Sayı: 2, 1093–1098. https://ajindex.com/articles/1059829