Journals / Gaziosmanpaşa Üniversitesi Sosyal Bilimler Araştırmaları Dergisi / 2013 / Cilt: 8 Sayı: 2

Sebeke analizinde cpm teknigi ve bir uygulama

Pages
—
Publication Date
2020-04-21
DOI
—
🏛️Bibliographic metadata and full text access for this article are provided via DergiPark.
DergiPark Record ↗
✨

AI Summary & Key Takeaways

AI Insight
⚡ TL;DR(Too Long; Didn't Read)

Furthermore, considering the accelerated time and costs, the method to complete the Project in the soonest period and with the lowest cost is calculated.\r\n

📌 3 Key Takeaways

🎯
Objective & Hypothesis:\r\n The purpose of this study is to investigate the CPM technique in network analysis.
📊
Key Findings & Data:Fort this aim, “Central Traffic Control” Project obtained from “Turkish State Railways” that will be established in Kayas- Kayseri line is elaborated.
💡
Conclusion & Impact:Furthermore, considering the accelerated time and costs, the method to complete the Project in the soonest period and with the lowest cost is calculated.\r\n
🔬Design:Research Article
📍Scope:Comprehensive Sample
⚙️Variables:Sebeke Analizi · CPM Teknigi · Hızlandırılmıs Zaman Ve Maliyetler

Abstract

\r\n The purpose of this study is to investigate the CPM technique in network analysis. Fort this aim, “Central Traffic Control” Project obtained from “Turkish State Railways” that will be established in Kayas- Kayseri line is elaborated. The critical and non-critical activities were determined and with the aid of these activities, the critical path was devised. Furthermore, considering the accelerated time and costs, the method to complete the Project in the soonest period and with the lowest cost is calculated.\r\n

Özet

\r\n Bu çalısmanın amacı, sebeke analizinde CPM tekniginin arastırılmasıdır. Bu amaçla verileri “Türkiye Cumhuriyeti Devlet Demiryollarından” temin edilen Kayas – Kayseri arasında bulunan demiryolu hattına kurulacak olan “Merkezi Trafik Kontrol” projesi ele alınmıstır. Projeye ait sebekede kritik ve kritik olmayan faaliyetler belirlenmis ve bu faaliyetlerden yararlanarak kritik yol bulunmustur. Ayrıca faaliyetler için hızlandırılmıs zaman ve hızlandırılmıs maliyetler dikkate alınarak projenin en kısa sürede ve en az maliyetle tamamlanması hesaplanmıstır.\r\n

🔖

Cite This Article

RENÇBER, B. A. (2020). Sebeke analizinde cpm teknigi ve bir uygulama. Gaziosmanpaşa Üniversitesi Sosyal Bilimler Araştırmaları Dergisi, Cilt: 8 Sayı: 2. https://ajindex.com/articles/1038025

📄 Full Text PDF Viewer

📄

PDF görüntüleyici hazırlanıyor...